[Fig. 21] is an elevation.

No. 31. This plan is of the same general character as [No. 27], but is somewhat contracted. There is a wash-stand in the little room on the stair landing, a few steps above the reception-hall floor. This building, without appurtenances, cost $2,400, as per schedule “B.”

[Fig. 22] is an elevation of this plan.


CHAPTER XXV.