Colonel Verbeck ordered Company L, in support of the 2d Battalion, to make a wide flanking movement to the east and secure the ridge which had been denied to Company G. The company moved out at 1630 but was unsuccessful. As it withdrew it made contact with Company F which had successfully pushed forward but because of an unexplained misunderstanding of orders had withdrawn.[41] Night perimeters were established on the edge of Breakneck Ridge.

On the same day Colonel Chapman, commander of the 19th Infantry, ordered his 2d Battalion to send a reinforced rifle company to Hill 1525 about 2,600 yards southeast of Limon, seize this ground, and, in support of the advance south by the 21st Infantry, direct artillery fire on Highway 2. Company G, 19th Infantry, moved out on this mission with only two thirds of a ration per man, since its kitchens were still in the Jaro area. The guides with Company G lost their way, and the company set up a night perimeter after a patrol had located a strong enemy position on a ridge west of its course. The company position was thought to be in the vicinity of Hill 1525, but it was actually far east of the hill.[42]

As the 2d Battalion, 21st Infantry, had failed to secure the ridge 400 yards to its front, Colonel Verbeck that night ordered the battalion, with Company L attached, to continue the attack toward the ridge after an artillery barrage on the following morning. The 1st Battalion was to secure Hill 1525, establish contact with the 2d Battalion, 19th Infantry, and from the hill envelop the southern flank of the 1st Division.[43]

On the morning of 8 November a typhoon, moving in from the west, swept over the entire island. Jan Valtin, a member of the 24th Division, graphically describes it: “From the angry immensity of the heavens floods raced in almost horizontal sheets. Palms bent low under the storm, their fronds flattened like streamers of wet silk. Trees crashed to earth. In the expanse of ... [cogon] grass the howling of the wind was like a thousand-fold plaint of the unburied dead. The trickle of supplies was at a standstill. On Carigara Bay the obscured headlands moaned under the onslaught of the ... seas. Planes were grounded and ships became haunted things looking for refuge. Massed artillery ... barrages to the summit of Breakneck Ridge sounded dim and hollow in the tempest. Trails were obliterated by the rain. The sky was black.”[44] In the midst of the storm, the infantry attacked.

ENGINEERS REMOVE LAND MINES from a bridge on Breakneck Ridge.

The 2d Battalion, 21st Infantry, effectively used flame throwers to drive the enemy troops out of spider holes and caves.[45] Although shelled by sporadic artillery fire, the battalion continued to advance. Strong elements of the 57th Infantry hotly contested the American assault. Meanwhile Company E pushed farther along the road until it was halted at the site of a bridge which had been destroyed by the enemy. The Japanese had flanked the site with emplacements from which rifle, automatic weapons, and mortar fire resisted the frontal attack of the company.[46] At nightfall Company E fell back to its morning position. The 57th Infantry continued to make a determined stand against the 2d Battalion. Concealed Japanese riflemen fired continuously on the front, flanks, and rear of all positions and small enemy detachments infiltrated through the lines. In concert with the attack of the 2d Battalion, the 1st Battalion had moved out that morning toward Hill 1525. Since the maps were grossly inaccurate, the precise location of the hill was unknown, but the battalion reported that it had reached the southern slope of the hill at 1600 and was digging in under automatic weapons fire. At 0700 the 2d Battalion, 19th Infantry, under Colonel Spragins, moved out through a driving rain and over precipitous trails to join the battalion’s Company G. During the day Company G drove the enemy off the ridge where the company’s advance had been halted the previous afternoon. In their flight the Japanese abandoned much equipment, most of which was new. Of more importance, a significant field order of the 1st Division was found on the body of a Japanese officer.

When the consolidation of the battalion was made, Colonel Spragins determined that he was east of Hill 1525 as shown on the maps. Although the battalion was in a position to observe Leyte Valley, it would have to move westward in order to get a view of Ormoc Valley. At 1530 Colonel Spragins therefore sent Company E to occupy a ridge 1,000 yards to the west. The battalion then dug in for the night.[47] On the following morning General Irving placed the battalion under the operational control of the 21st Infantry.

Immediately in front of the 21st Infantry was a Japanese force estimated to be of battalion strength. To the east was an undetermined number of enemy machine guns. In front of Company E a bridge was out and tanks could not pass. On the steep sides of the gulch around this bridge site, elements of the 57th Infantry with rifles, automatic weapons, and mortars stopped all attempts of Company E to move forward.[48]

Through the night torrential rains fell. At dawn of 9 November two begrimed, soaked, and weary battalions of the 21st Infantry jumped off to the attack, the 2d Battalion, less Company F, on the west side of the road and the 3d Battalion on the east. Heavy artillery preparations had already pounded the Japanese front lines. As the attack progressed, mortars and artillery placed fires on targets of opportunity. In destroying pockets of resistance in the gulch, grenades, rifles, and flame throwers were used, together with heavy machine guns.