75. To test the capacity of the separator, a mixture containing 6 lbs. of sand, passed through a 50-mesh screen, 3 lbs. of common wheat flour and 16 lbs. of Portland cement shall be spread over 50 sq. ft. of floor and picked up with a renovator attached to the end of 50 ft. of 1¹⁄₄-in. hose. The machine shall be stopped and the material removed from the separator spread on floor and picked up. This procedure shall be repeated until the material has been handled four times. If the separator contains a bag, the same must not be disturbed until after completion of the capacity test, which will be made with the material in place in separator, after being picked up the fourth time.

After completion of capacity test, the contents of separator shall be weighed and if same be a partial separator it must contain 95% of the material picked up. If a displacement machine is used as a vacuum producer, the separator must prevent the passage of any dust through separator, which will be determined by holding a dampened cloth over pump outlet during test of apparatus. Said cloth must not show any dust lodged thereon at end of test.

76. To test the capacity of the plant a standard vacometer, attached to the end of 75 ft. of cleaning hose shall show a vacuum of 2 in. mercury with ¹⁄₂-in. diameter orifice open.

77. Test of Cleaning Tools. The plant shall be operated by the Contractor in the presence of the Architect’s representative, and a test made of each kind of cleaning tool furnished. The tool shall be attached to a 50-ft. length of hose attached to an outlet selected by the Architect’s representative, and under normal working conditions each tool must satisfactorily perform the work for which it was designed. Dust and surfaces to be cleaned shall be furnished by the contractor.

78. Painting. After the completion of the specified tests, all exposed iron work except galvanized iron or tinned work in connection with this apparatus, not specified to be otherwise finished, shall be primed with paint suitable for surfaces covered, and then given two additional coats. Machinery shall be painted as already specified, and all other work shall be given finishing tints as selected or approved by the architect. Black iron pipe, etc., shall be given two coats lead and oil of tint directed.

Modifications of Specifications when Alternating Current is Available.

—When alternating current is available, instead of direct, modify specifications as follows:

23. Motor to be wound for .... volts, .... cycle, .... phase alternating current.

24. Motor to have rotor of the squirrel cage type.