On the solidified, stabilized surfaces of Pluto and
Charon the Cadre would erect a tank town dome. The
dome would have a ten-kilometer radius on Planet
Pluto and a one-kilometer radius on Charon.

Construction would proceed concurrently on surface and subsurface utility and life support facilities essential to human habitation. When enclosed areas were shirtsleeve ready for occupancy, the Cadre would erect essential life support, residential and recreational facilities. These would be followed by technical, communications and transport networks for Slingshot scientists, industrial technicians, and staff, followed by enclosed living areas for the remainder of the general populace that would train and do the work during the subsequent phases.

The tanktown on Planet Pluto would be named
Coldfield; its counterpart on Charon would be
Lamplight.

An On-site Project Management Team (OPMT) directed the Advance Cadre. The OPMT formed the nucleus of upper level managers, scientists and engineers, and other experts charged with organizing and guiding the functional task groups. The functional staffs would bring into being the on-site technical and administrative support facilities, install and operate its equipment, and govern the communities within which the populace worked and resided.

The OPMT was organized into three groups: Group
One: Planet Pluto; Group Two: Charon, and Group
Three: Logistics Depot. Each Group had its mission:

Group One (Planet Pluto) Mission

Five kilometers from Coldfield, construct and operate a simplified fusion-based energy generating and power transmission system to provide sufficient output to support all anticipated power and network requirements of the planet;

Beneath and adjacent the Coldfield dome, construct, organize and operate encapsulated surface and subsurface laboratories, manufacturing and overhaul plants, space and surface transport and traffic routes and controls, surface roadways, utility and communications systems, landing and mooring facilities, energy hubs for gravity enhancement grids, and other essential utilities and facilities;

Establish and administer institutions for law enforcement, public health, education and other community affairs.

Group Two (Charon) Mission