Top:
| 1. Cut eight pieces of flooring 36" long for the top. |
| 2. Plane off the groove of one piece and nail it on the top of the frame, so that the smooth edge and the ends project 1" over the front side and ends of the cabinet. |
| 3. Nail the rest of the flooring on for the top, being sure that each joint matches tightly. The last piece must also project 1" over the back side. |
Casing:
| 1. Nail the casing, which is 1-¾" wide, on the front of the cabinet. |
Doors:
| 1. Make each door ¾" × 14⅜" × 22⅞" from five pieces of ceiling 22⅞" long, held together by cleats at the top and bottom. |
| 2. Fit each door carefully, then hang them with butt hinges. Fasten a cupboard catch on each door. |
Drop Door:
| 1. Make the drop door 13-16" × 14⅜" and hinge it with a pair of butt hinges. Put on the stopper chain and catch. |
| The swing tops are each made from six pieces of flooring 24" long cleated together. |
| 1. Plane off the groove edge of one piece and match them all together. |