The railways constructed by such aid may be briefly noted. The Buffalo and Lake Huron, extending from Fort Erie to Goderich, was completed in 1858. It had its origin in the ambition of Buffalo to have more immediate connection with the rich western peninsula of Upper Canada and the Lake trade beyond than was afforded by the Great Western. The London and Port Stanley, built in 1854-56, mainly by the city of London, with smaller contributions from Middlesex and Elgin counties and the city of St Thomas, failed to realize the expectations that it would become the main artery of trade between Canada and the states across the lake, but it developed a fair excursion trade and coal traffic, and indirectly justified its construction. The Erie and Ontario portage road, rebuilt in 1854, has already been noted. Another portage road round Niagara Falls was the Welland Railway, planned by W. Hamilton Merritt, the projector of the Welland Canal. It ran from Port Colborne on Lake Erie to Port Dalhousie on Lake Ontario, twenty-five miles, and was completed in 1859, only to add one more to the list of unprofitable roads, and eventually to be absorbed by the Great Western.

Farther east the rivalry of Port Hope and Cobourg led to the construction of two roads, the Cobourg and Peterborough and the Port Hope, Lindsay and Beaverton. Both relied chiefly on timber traffic and aimed to develop the farming country in the rear. The Cobourg line, begun in 1853, suffered disaster from the start: the contractor's extras absorbed all the cash available; the three-mile bridge built on piles across Rice Lake gave way, and after $1,000,000 had been expended the road was sold for $100,000. The Port Hope line, which absorbed a branch from Millbrook to Peterborough in 1867, fared somewhat better. The Brockville and Ottawa was a lumber road, carrying supplies up and timber down. It was chartered to run from Brockville to Pembroke, with a branch from Smith's Falls on the Rideau Canal to Perth. By 1859 it had reached Almonte, and six years later struggled as far as Sand Point on the Ottawa, when it halted, till the Canadian Pacific project gave it new life. After failing to make ends meet for some years the company went through repeated reorganizations in the early sixties. The Bytown and Prescott, later the St Lawrence and Ottawa, built in 1854, was also a lumber road, promoted by interests connected with the Ogdensburg Railway, whose terminus was opposite Prescott. It suffered the same financial fate, and was sold to the English company which had supplied the rails, at a total sacrifice of municipal and other creditors' interests. Around the Long Sault rapids in the Ottawa there was built in 1854 the thirteen-mile Carillon and Grenville, a summer portage road, an early enterprise which retained its independence and its old five-foot-six-inch gauge until 1912, when it was absorbed by the Canadian Northern. In Lower Canada the only minor road built which has not been referred to was the Stanstead, Shefford and Chambly, opened in 1859 from St Johns to Granby, and forming practically an extension of the Champlain and St Lawrence from the former point.

[[1]] As a matter of fact, discussion of this scheme began in St Andrews in 1827, and in 1828 John Wilson convened a meeting of the citizens to further it.

[[2]] The Brassey firm were paid about £9000 sterling a mile for the line from Toronto to Montreal, £8000 for the section from Quebec to Rivière du Loup, £6500 for the Quebec and Richmond road, and £1,400,000 for the Victoria Bridge. Gzowski and Co., consisting of Messrs Gzowski, Holton, Macpherson, and Galt, secured the Toronto to Sarnia contract at £8000 a mile. In both cases these prices included equipment. The English contractors were required to take a large portion of their pay in depreciated bonds and stock, whereas the Canadian contractors were given cash; on the other hand, Brassey had a higher price and less difficult country to work in. The English firm, with all their experience, were not familiar with building roads in countries where labour was dear, and the plant they sent out was antiquated compared with the labour-saving equipment familiar to American and Canadian contractors. They claimed to have lost a million pounds on their enterprise, while Galt, Holton, Macpherson, and Gzowski all made fortunes.

[[3]] Port Hope borrowed for railway investment $740,000, Cobourg and Brantford $500,000 each, and Brockville $400,000—all towns of less than 5000 people. The counties of Lanark and Renfrew borrowed $800,000, and villages borrowed in proportion. In all some $6,500,000 was borrowed through the Loan Fund for railway purposes alone, the bulk of it in Upper Canada, while another three million was invested by towns that borrowed on their own responsibility. To aid the Brockville and Ottawa Railway, for example, Lanark and Renfrew advanced $800,000, Brockville $415,000, and the township of Elizabethtown $150,000, or over half the cost of the road. Huron and Bruce invested $300,000 in the Buffalo and Lake Huron, and other municipalities $578,000, and so on throughout the province.