In the first place, it seems clear that a new transcontinental was needed, not only to open the West, but to develop the hinterland of eastern Canada. The rediscovery of a vast clay belt north of the height-of-land between Hudson Bay and the Great Lakes, its known resources in timber and pulp and its probable mineral wealth, as well as the farming areas of the western plains, and the forest, mine, and fishery wealth of northern British Columbia, all gave some economic justification for the adventure. Perhaps even stronger were the political considerations. Here, again, if railways were Canada's politics, it was not only because Canadians were materialists, but because they were idealists. They were determined that, in spite of geography and diplomacy, in spite of Rocky Mountains and Lake Superior wildernesses, Laurentian plateaus and Maine intrusions, Canada should be made one and independent. Often this national spirit has been manipulated to serve sordid ends in railway as in tariff matters; the flag has covered a multitude of sinners. Yet whether it was the Grand Trunk or the Intercolonial, the Canadian Pacific or the Grand Trunk Pacific, the national purpose has been strong, and must fairly be set on the assets side of the sheet. Sir Wilfrid Laurier and Sir John Macdonald both worked with high courage and enduring faith for a greater and more united Canada. Any one who looked at a map of the Dominion and realized how incredibly narrow a fringe of population was strung out on the southern border, could not but feel that some attempt to add a second storey to the structure, to give breadth as well as length, was a national necessity. Perhaps least defensible was the Quebec-Moncton section; true, it was essential, if freight was to reach the Maritime ports, that a shorter line with better grades than those of the Intercolonial should be secured if possible. Grades were bettered in the lines secured, but the saving in distance was not as great as old and incorrect surveys had led the government to anticipate.
How should the road be built, granted its need? Government ownership had its advocates, but experience of political 'machines' and a recognition of the difficulties of a government line in carrying on steamship or irrigation or other subsidiary activities, or in making international extensions, told heavily against such a policy. The real choice lay between the two private companies, the Grand Trunk and the Canadian Northern, which were seeking to rival the Canadian Pacific. Undoubtedly the best solution would have been to amalgamate these companies, and thus to save the eventual outlay on a line north of Lake Superior, on closely parallel lines in the prairies, and on the enormously costly rival lines to be built through the Rockies. True, competition even in railway matters has still its merits, but one strong competitor of the Canadian Pacific would have better served the country than two in financial straits. This solution appeared for a time possible. As has been seen, negotiations were carried on in 1902 and 1903 looking to such a union, but unfortunately without result. Forced to choose, the government had no alternative but to give its aid to the older and better known system.
What standards were to be set for the new road? The continent's pioneer traditions were plain: build the road in the cheapest way it could be made to hold together, with sharp curves and steep grades if need be, with scanty ballast, wooden bridges, and light rails, since traffic would be light and capital hard to get. Then, if the country developed, and perhaps after a reorganization or two, rebuild the road on a permanent basis. But 1903 was not 1873, and Mr Hays had learned on the Wabash and on the Grand Trunk how difficult it was for a second-class road to compete, and how costly was the process of rebuilding with the line in operation. He knew that with high and rising wages for trainmen, and with frequency of service a minor matter on the long stretches, it was essential to concentrate loads in as few trains as possible, and that a locomotive could haul almost twice as great a load on a four-tenths grade as on a one per cent grade. So he determined to build from the outset up to the highest standard, securing a lower ruling grade than any other transcontinental enjoyed. The policy meant high fixed charges and low operating costs.
What outlay would be involved and what state aid was needed? Given the route and the standard set, the outlay could not but be vast. It proved, in fact, much greater than the estimates, as is the way with most big enterprises. The government section cost about a hundred and sixty instead of sixty millions, and the Grand Trunk Pacific section about a hundred and forty, or three hundred millions in all—twice the estimate for the Panama Canal and nearly its actual cost.[[2]] The standard set was high, and proved difficult to attain; labour was scarce and expensive, and prices of all materials were soaring constantly. The large expenditure lent colour to charges of corruption in the construction of the government section. Investigation after investigation was held, however, without revealing any gross betrayal of trust. One contractor had been handled too tenderly for repeated delays, possibly engineers sometimes stretched classification on a losing contract, and doubtless contractors were as usual given the privilege of contributing to party campaign funds. But, fortunately for the good name of Canada, the serious charges of corruption were not sustained.
Of this great outlay the country bore the lion's share. The Grand Trunk Pacific was organized as a subsidiary company of the old Grand Trunk, which secured control of ownership of all but a nominal share of the $25,000,000 common stock, given it in return for guaranteeing part of the Pacific bonds. Only $20,000,000 preference capital stock was provided for, and this was not issued. The interest of the independent shareholder was thus negligible. The money required was secured by the issue of bonds and debenture loans guaranteed by the government or the Grand Trunk. Up to 1914, in connection with the western section, the government had guaranteed the company's bonds to the amount of over eighty millions, had lent twenty-five millions for ten years at four per cent, and had made or promised a cash gift of twenty-three millions. On the eastern section, the company was subsidized by the use for seven years of the road, rent free, equivalent to thirty-four millions. It was a vast outlay, though not as difficult for the country to bear as one-third the amount would have been a generation earlier. The unique and consoling feature, so far as posterity was concerned, was that the bulk of the government expenditure was provided out of surplus current revenue, so that for the future the net income to be received from rental would much more than balance interest on borrowings.
Once the contract was ratified by parliament and by the Grand Trunk, and the new company had been formally organized with Mr Hays as president and Mr Frank Morse, and later Mr Chamberlin, formerly of the Canada Atlantic, as general manager, the work of surveying and determining the route began. On the government section political difficulties were met in New Brunswick, from the advocates of a route down the St John to the city at its mouth, and engineering difficulties of many forms in the long trail through the northern wilderness. The bridge which was being constructed by an independent company across the St Lawrence at Quebec collapsed in 1907, with great loss of life, and the delay in completing the second bridge made it necessary to depend upon car-ferries for some time. On the western section a good route through the prairies was decided upon, not without vigorous protest from the Canadian Pacific because of the close paralleling of its line. After repeated surveys of the Peace, Pine, Wapiti, and Yellowhead Passes, the last was chosen, and a line was settled upon down the Fraser and Skeena valleys, passing through two million acres of fertile land. Remarkably low grades were secured; in fact, as favourable as on the prairie section. Kaien Island, 550 miles north of Vancouver, was chosen as the terminus, rather than Port Simpson as originally designed, and soon on its magnificent harbour and most unpromising site of rock and muskeg the new and scientifically planned city of Prince Rupert began to rise.
As the main line ran far to the north of the St Lawrence lake and river system, the original plan provided for the construction of branch lines to Fort William, to North Bay, and to Montreal. Of these only the first, aided by the Dominion and also by the Ontario government, was built. For the connection with North Bay running rights over the provincial road, the Timiskaming and Northern Ontario, sufficed. Later, in 1914, the Dominion government itself decided to build the Montreal branch. In Alberta and Saskatchewan over 1200 miles of branch lines were begun, under guarantees of bonds by the provincial governments. In British Columbia an independent road, projected by the contracting firm of Foley, Welch and Stewart—the Vancouver, Pacific and Great Eastern—promised when completed to give the Grand Trunk Pacific, by a traffic agreement, entrance into Vancouver.
The first contracts on the main line were let in 1905. For ten years construction went on, at the rate of a mile a day, with occasional slackening from scarcity of labour or financial stringency, but with no complete halt. Last to be completed were the section to be built by the company in the Central plateau of British Columbia and the section built by the government west of Cochrane. Meanwhile, the prairie lines had been in operation through to Edmonton since 1910, and grain reached Fort William over the Lake Superior branch in the same year.
From the beginning it had been questioned whether the Grand Trunk Pacific would carry out its bargain to operate the government section. The management professed its intention to perform every promise, but fulfilment was delayed. In 1915 the company demurred to assuming the lease, on the double ground that the road was not definitely completed, and that, since the change of government in 1911, the standard of construction agreed upon had not been maintained. Accordingly the government took power to operate the road from Winnipeg to Moncton, and to expropriate the company's branch from Superior to Fort William, pending further negotiations.