After the sail is set, it is sometimes necessary to get the sheets closer home. Slack the halyards, lee brace, and weather bowline, clap the watch-tackle upon the lee sheet first, and then the weather one, shivering the sail by the braces if necessary. Overhaul the clewlines and reef-tackles, slack the topgallant sheets, and hoist the sail up, taut leech, by the halyards.

To set a Topgallant Sail or Royal.—Haul home the lee sheet, having one hand aloft to overhaul the clewlines, then the weather sheet, and hoist up, taut leech, by the halyards. While hauling the sheets home, if on the wind, brace up a little to shake the sail, take a turn with the weather brace, and let go the lee one; if before the wind, let go both braces; and if the wind is quartering, the lee one.

To set a Flying Skysail.—If bent in the manner described in this book, let go the brails and royal stay, and hoist on the halyards.

To set a Jib, Flying-Jib, or Fore Topmast Staysail.—Cast off the gasket, hoist on the halyards, and trim down the sheet.

To set a Spanker.—Hoist on the topping-lifts, make fast the weather one, and overhaul the lee one. Let go the brails, and haul out on the outhaul. Be careful not to let the throat brail go before the head and foot. Trim the boom by the sheets and guys, and the gaff by the vangs.

To set a Spencer.—Take the sheet to the deck on the lee side of the stay, let go the brails, haul on the sheet, and trim the gaff by the vangs.

To take in a Course.—If the wind is light and there are hands enough, let go the tack, sheet, and bowline, and haul up on the clew-garnets, buntlines, and leechlines, being careful not to haul the buntlines taut until the clews are well up. If light-handed, or the wind fresh, let go the bowline and ease off the tack, (being careful to let the bowline go before the tack,) and haul up the weather clew. Then ease off the sheet and haul up on the lee clew-garnet, and the buntlines and leechlines.

To take in a Topsail.—The usual mode of taking in a topsail when coming to anchor in light winds, is to lower away on the halyards and haul down on the clewlines and reef-tackles, (if the latter run in the way described in this book,) until the yard is down by the lifts, rounding in on the weather brace, and hauling taut to leeward, when the yard is square. Then let go the sheets and haul up on the clewlines and buntlines. A better way is to start the sheets, clew about one third up, then let go the halyards and take the slack in.

If the wind is fresh, and the yard braced up, lower away handsomely on the halyards, get the yard down by the clewlines and reef-tackles, rounding in on the weather brace, and steadying the yard by both braces. Then let go the weather sheet and haul up to windward first. The weather clew being up, let go the lee sheet and haul up by the clewline and buntlines, keeping the clew in advance of the body of the sail.

Sometimes, if the weather brace cannot be well rounded in, as if a ship is weak-handed, the sail may be clewed up to leeward a little, first. In which case, ease off the lee sheet, and haul up on the clewline; ease off the lee brace and round the yard in; and when the lee clew is about half up, ease off the weather sheet and haul the weather clew chock up. Haul the buntlines up after the weather clew, and steady the yard by the braces. There is danger in clewing up to leeward first that the sail may be shaken and jerked so as to split, before the weather clew is up; whereas, if clewed up to windward first, the lee clew will keep full, until the lee sheet is started.