BRISTOL AND EXETER RAILWAY TRAIN BRINGING MAILS TO BRISTOL ON THE DECLINE OF THE MAIL COACH SYSTEM ABOUT 1844. (CLIFTON BRIDGE ANTICIPATED BY THE ARTIST.)
"Manchester, 4th July, 1837. Sir, I have much pleasure in stating that the London Bag arrived here this day by railway at half-past twelve p.m. The Bag to London was despatched as usual this morning by the mail coach, but concluding that a return by the railway is intended both this day and to-morrow (although the arrangements generally do not commence until the 6th) I make a despatch with such letters as are in the office at half-past two p.m., and propose doing the same to-morrow. I am, Sir, Your most obedient, humble Servant, (Sig.) G.F. Karstadt. To Lt.-Col. Maberley."
"4th July, 1837. Manchester. G. Karstadt, Esq. For the Postmaster-General. I enclose a letter from Mr. Louis with this report from Mr. Karstadt as to the first working of the railroad. I am sorry to say that it appears from the time bills an hour was lost upon the railroad coming up. (Signed) J.V.L.M. (Lt.-Col. Maberly). 5th July, 1837. Read, Lichfield (Lord Lichfield)." The coaches running all the way through at this period were timed to leave London at 8 p.m., and arrive at Liverpool and Manchester at 2.30 p.m. On the up journey the coaches left Manchester and Liverpool at 11.30 a.m., and reached London at 6.30 a.m.
The conveyance of the mail partly by road and partly by rail came into operation on the Western road from 1838 to 1841 as section by section of the Great Western Railway became completed. Thus, in 1840, mails which had come by road between Maidenhead and Bath were brought into Bristol by trains composed of very primitive engines, tenders and coaches, as depicted in the illustrations taken from engravings of the period.
Mr. J.W. Arrowsmith, the world-wide known Bristol Publisher, recently reprinted Arrowsmith's Railway Guide of 1854, the year of its first issue. It is interesting to note from the re-publication that the shortest time in which Mails and passengers were conveyed between London and Plymouth was 7 hours, 25 minutes, and between Plymouth and London 7 hours, 35 minutes. What a change a half-century has brought about! The pace of the trains has been vastly increased, and even goods trains accomplish the journey from London to Bristol in three hours. There is no such thing as finality in speed, as the Great Western Railway Company has been trying a French engine, with a view to beat all previous records. One of these engines was tried in France with the equivalent of fifteen loaded coaches behind it. It was brought to a dead stop on a steep incline, and when started again it gathered speed, so that before the summit was reached it was travelling at its normal speed—74.6 miles an hour.
This new engine, "La France," recently accomplished a brilliant feat. She was started from Exeter with a load of twelve of the largest corridor-bogies, one being a "diner," the whole weight behind her tender, including passengers, staff, luggage, and stores, being nearly 330 tons. "La France" ran the 75½ miles to Temple Meads Station, Bristol, in 72½ minutes, start to stop, thus averaging 62.5 miles an hour, although she had to face a 20-mile climb at the start, the last 27 miles of this stretch being at 1 in 115. She went on from Bristol to London, 118½ miles, with the same heavy load, in exactly 118 minutes. Her time from Bath to Paddington, 107 miles, was 104 minutes; from Swindon, 77¼ miles, 72 minutes; from Reading, 36 miles, 33 minutes.
A good performance in long distance railway running was established by the Great Western Railway Company in connection with the visit in 1903 of the Prince and Princess of Wales to Cornwall. Their Royal Highnesses left Paddington in a special division of the Cornishman at 10.40 a.m., the train being timed to do the non-stop run to North Road, Plymouth, a distance of 245 miles, in four hours and a half. This time was, however, reduced to the extent of 36¼ min., the train steaming into North Road at 33¾ minutes past 2 o'clock. The train covered during the first hour's run 67¾ miles, the average speed for the whole journey to Plymouth being 1.049 miles per minute. The journey was performed in about half the time occupied in 1854.
[By permission of "Great Western Railway Magazine."
"LA FRANCE"—POWERFUL NEW GREAT WESTERN RAILWAY ENGINE.
The up train, which runs from Bristol to London in exactly two hours, via Badminton, is matched by a down train in the same time by the easier but slightly longer main line (via Bath), giving a start-to-stop speed of 59-1/8 miles an hour, with a dead slow through Bath Station. But to Bath, where a coach is slipped, the inclusive speed is 60 miles an hour, as the distance is 107 miles (all but 10 chains), and the time from Paddington, 1 hr. 47 min. This is by the 10.50 a.m. "Cornishman," and is said to be the first Great Western train ever booked at a mile a minute, and the first train on any London Railway even "scheduled" at that speed.