On the morning of January 20 all were at work betimes. As we were securely isolated from a trades hall, our hours of labour ranged from 7 A.M. till 11 P.M.

Dynamite was to be used for blasting out the holes for the reception of the stumps, and so the steel rock-drills were unpacked and boring commenced. This was easier than it appeared, because the rock was much traversed by cracks. By the end of the day a good deal of damage had been done to the rock, at the expense of a few sore fingers and wrists caused by the sledge-hammers missing the drills. The work was tedious, for water introduced into the holes had a habit of freezing. The metal drills, too, tended to be brittle in the cold and required to be tempered softer than usual. Hannam operated the forge, and picks and drills were sent along for pointing; an outcrop of gneiss serving as an anvil.

Among other things it was found difficult to fire the charges, for, when frozen, dynamite is not readily exploded. This was overcome by carrying the sticks inside one's pocket until the last moment. In the absence of earth or clay, we had no tamping material until some one suggested guano from the penguin rookeries, which proved a great success.

Next day the stumps were in place; most of them being fixed by wedges and other devices. Cement was tried, but it is doubtful if any good came of it, for the low temperature did not encourage it to set well. By the evening, the bottom plates were laid on and bolted to the tops of the stumps, and everything was ready for the superstructure.

On January 22, while some were busy with the floor-joists and wall-frames, others carried boulders from the neighbouring moraine, filling in the whole space between the stumps. These were eventually embedded in a mass of boulders, as much as three feet deep in places. By the time both huts were erected, nearly fifty tons of stones had been used in the foundations—a circumstance we did not regret at a later date.

Hodgeman was appointed clerk of works on the construction, and was kept unusually busy selecting timber, patrolling among the workmen, and searching for his foot-rule which had an unaccountable trick of vanishing in thin air.

Hannam had various occupations, but one was to attend to the needs of the inner man, until the completion of the hut. There is no doubt that he was regarded at this time as the most important and popular member of the party, for our appetites were abnormally good. About an hour before meals he was to be seen rummaging amongst the cases of provisions, selecting tins of various brands and hues from the great confusion. However remote their source or diverse their colour, experience taught us that only one preparation would emerge from the tent-kitchen. It was a multifarious stew. Its good quality was undoubted, for a few minutes after the "dinner-bell rang" there was not a particle left. The "dinner-bell" was a lusty shout from the master cook, which was re-echoed by the brawny mob who rushed madly to the Benzine Hut. Plates and mugs were seized and portions measured out, while the diners distributed themselves on odd boxes lying about on the ice. Many who were accustomed to restaurants built tables of kerosene cases and dined al fresco. After the limited stew, the company fared on cocoa, biscuits—"hard tack"—and jam, all ad libitum.

On those rare summer days, the sun blazed down on the blue ice; skua gulls nestled in groups on the snow; sly penguins waddled along to inspect the building operations; seals basked in torpid slumber on the shore; out on the sapphire bay the milk-white bergs floated in the swell. We can all paint our own picture of the good times round the Benzine Hut. We worked hard, ate heartily and enjoyed life.

By the evening of January 24 the floor and outside walls were finished, and the roof-frame was in position. Work on the roof was the coldest job of all, for now there was rarely an hour free from a cold breeze, at times reaching the velocity of a gale. This came directly down from the plateau, and to sit with exposed fingers handling hammer and nails was not an enviable job. To add to our troubles, the boards were all badly warped from being continually wet with sea-water on the voyage. However, by judicious "gadgetting," as the phrase went, they were got into place.