The first step was taken under the act on the 7th of June, 1842, when the commissioners met, and T. C. Hornyold, Esq., was elected chairman. Mr. Thomas Waters was appointed clerk. Mr. William Cubitt was appointed engineer-in-chief, Mr. E. L. Williams retaining his office as resident engineer; and advertisements were ordered to be inserted in the newspapers for loans. The first stone of Lincombe weir was laid on the 5th of August, 1843.
At several subsequent meetings of the Commission, the Gloucester commissioners amused themselves by offering every possible opposition to the speedy progress and completion of the work; though they were, of course, appointed for the express purpose of carrying it out. However, they were always out-voted by those commissioners who felt their interest and honour alike concerned in the duties assigned to them by Parliament, and the trial weir at Lincombe was opened on December 23, 1843. Spite of the ratiocinations of adverse engineers, and those ignoramuses who fancy they know everybody’s business better than their own, the weir was found to stand the current, floods, and frosts of the winter admirably, and the barge was passed through the locks in three minutes.
The work now proceeded rapidly—the Staffordshire and Worcestershire Canal Company having advanced the necessary funds, and the contracts having been taken by Messrs. Grissell and Peto; with the exception of one sad accident on the 5th of August, 1844, by which twelve of the workmen engaged at Diglis lost their lives by the upsetting of the boat in which they were returning from their work, they were completed without a single drawback or mishap. The lock at Diglis was opened on the 9th October, 1844; and this part of the work was thus completed in fifteen months, in the most able and satisfactory manner, within the original estimate of its cost, £140,000—a fact almost unexampled in the construction of great national undertakings of this kind. The dredging, however, between Diglis and Gloucester, occupied a longer time than had been expected, and proved a very costly business; but this, it must always be borne in mind, formed no part of the promoters’ scheme, but was forced upon them by the landowners, who objected to the erection of any weirs below Diglis.
The completion of the locks and weirs was celebrated on the 25th of January, 1844, by a public dinner at the Guildhall, Worcester, when a testimonial was presented to J. W. Lea, Esq., for the zeal he had always manifested in the improvement of the river. J. S. Pakington, Esq., M.P., occupied the chair, and Alderman Edward Evans was vice-president. Amongst the party were Lord Hatherton, the Mayor of Worcester, T. C. Hornyold, Esq., Captain Winnington, John Dent, Esq., William Cubitt, Esq., &c. The testimonial, which consisted of a quantity of silver plate, with Mr. Lea’s crest engraved on each article, was of course presented by the chairman.
At the close of 1846, Mr. Cubitt certified that a depth of six feet of water had been obtained from Lincombe to Gloucester, and the Commission consequently met on the 1st of January, 1847, and ordered tolls to be levied at all the locks in the terms of the Act of Parliament. Some opposition was offered, both by Gloucester Commissioners and by traders on the river; but on Mr. Cubitt’s certificate the step of raising tolls was obligatory on the Commission. There can be no doubt that at the time of Mr. Cubitt making the certificate there was six feet of water in the river, though every one saw that under the system of dredging it would be impossible to maintain that depth in all seasons of the year.
At the annual meeting of the Commission in September, 1847, the traders complained that the depth of water in the river between Worcester and Gloucester was not six feet, and expressed their belief that it could not be secured without additional locks and weirs. The committee of works reported to the same effect, and declared the dredging a failure. A committee was, therefore, appointed to consider the best means of completing the improvement between Diglis and Gloucester.
This committee reported to a meeting of the Commission, held on the 13th December, 1847, recommending that application should be made to Parliament for powers to put a weir in at Tewkesbury, and to raise a dam at Over bridge, near Gloucester, to divert the water into the other channel and to scour out the silt accumulating there. The meeting assumed a very unpleasant character—such personal and improper remarks being made that Sir John Pakington, at one time, left the chair, but was induced to return. The opposing commissioners negatived that part of the proposal which related to the dam at the Over bridge by a majority of seven to four. Preparation was therefore made to apply to Parliament for the Tewkesbury weir alone; but Parliament had, at this time, taken it into their heads that a “preliminary inquiry” ought to be made on the spot into measures of this sort; and, accordingly, in February, 1848, sent Mr. Cockburn Curtis, a young engineer, to take evidence, and make a report to the Admiralty. At Gloucester he took a show of hands as to whether the Commissioners had kept faith with the public in imposing toll or not! Mr. Curtis’s report was in accordance with the unfriendly influence then prevailing at the Admiralty, and he recommended a scheme of his own instead of the Tewkesbury weir—a scheme which few people, besides Mr. Curtis himself, have ever been able to comprehend.
With this report in their hands, the interested opponents of all improvement on the river waited on those members of Parliament whom they could in any way influence, stole a march on the promoters, and threw out the bill most unexpectedly on the second reading by a majority of 104 to 91. This was on the 6th March, 1848.
At a meeting of the commissioners, held in October of the same year, both parties mustered their forces, and divided, in the first place, upon the question of who should be chairman, and 13 votes were given for Sir John Pakington and 11 for Mr. Hyett. It was then proposed by Mr. Lea that an application should be again made to Parliament, similar to the one of the preceding session. It was represented that the Commission was in debt to the contractors, principally because of the great expense incurred in useless dredging, and that more money must be raised. After a very stormy debate the renewed application was agreed to by the chairman’s casting vote only, and so also were other necessary resolutions. In minor matters the opposition had a majority.
In February, 1849, the “preliminary inquiry” took place into the merits of this measure. The surveyors appointed by the Admiralty on this occasion being Captain Bethune and Mr. Veitch, C.E. These gentlemen again reported unfavourably of the scheme as proposed by the Commission, professing themselves desirous of seeing the river so altered below Gloucester as to bring the tide up to Worcester! It was understood that the great fight would again take place on the second reading, which came on on the 23rd April, 1849. The Admiralty, Board of Trade, and Government generally, Sir Robert Peel, &c., supported the second reading; but the private interests in opposition prevailed, and the bill was once more thrown out; this time by a majority of 34—191 voting against it, and 134 in its favour.