The gravel may be compacted by rolling or may be allowed to pack from the action of traffic. The former is greatly to be preferred where practicable. The rolling is performed with a three-wheeled self-propelled roller weighing about 8 tons and must be done while the gravel is wet. Generally a sprinkling wagon is used to wet down the gravel, but advantage is always taken of rains to facilitate the work. The gravel must be spread in layers not over 5 or 6 inches thick to get the desired results, which means that for an ordinary gravel road about 10 inches thick, the gravel will be placed in two layers of about equal thickness, each of which will be rolled.
The gravel will compact slowly even if it is not rolled, but generally does not become stable until the material is thoroughly soaked by rains. Then it will begin to pack, but will become badly rutted and uneven during the process. During this period the surface must be kept smooth by means of the blade grader. The drag does not suffice for this purpose, tending to accentuate the unevenness rather than to correct it.
If gravel is placed in a trench in dense soil and rainy weather ensues, sufficient water will be held in the trench to cause unevenness from foundation settlement and the gravel will become mixed with the soil to some extent and be thereby wasted. Trenches cut from the road bed upon which the gravel is placed, to the side ditches, will relieve this condition by affording an outlet for the surplus water. Nevertheless some difficulty may be expected if the trench method is used and wet weather prevails. If it is possible to close the road against traffic until the road is dry the method is applicable. Moreover, in long-continued dry weather, the dispersion and loss of considerable gravel from the action of automobile traffic is avoided because the gravel is held between substantial earth berms and the gravel will pack better and hold its shape longer when constructed by the trench method than otherwise.
Surface Method.—The surface method is one in which the gravel is placed on the graded earth road surface without earth shoulders to hold the gravel in place. It is also sometimes called the feather-edge method. Except for the manner of placing as just mentioned, the several operations are conducted in the same general manner as for the trench method. The gravel does not compact as quickly as in the trench method and a considerable loss of material is likely to result from the effect of automobile traffic while the gravel is loose. But it has the advantage of being free from difficulties in wet weather and in some locations is therefore preferable to the trench method. It is particularly applicable to those projects on which the placing of gravel continues throughout the winter, the gravel being dumped and spread, to be finally smoothed and finished in the early summer.
Bonding.—Where gravels deficient in binder are utilized, clay for binder is sometimes added as the gravel is placed on the road. This may be done by spreading the clay on top of the lower course of gravel, placing the upper layer and sprinkling and rolling until the clay squeezes up through the surface layer. It may also be accomplished by spreading dry clay on the upper course before it is harrowed and then harrowing to mix it with the gravel. Both methods are practiced, but the former is believed to be preferable. A third method is to separate the sand and pebbles and to mix the clay binder with the sand and then spread the sand on top of the pebbles and mix by harrowing.
Maintenance.—Gravel surfaces require careful maintenance, especially during the first season the road is used. The gravel will compact slowly and during the process will be rutted and otherwise disturbed by traffic. It is important during this period to restore the shape once a week or at least twice a month. The light blade grader is usually employed for the purpose so long as the gravel is somewhat loose. Later a drag of the type known as the planer will prove to be the most effective. Figure 16 shows a type of drag that is very satisfactory for use on gravel roads.
Fig. 16.—Road Planer