FIG. 45. ROOF OF SAME.

FIG. 46. MODERN ICE PIT.

FIG. 47. ITS CONSTRUCTION.

The Site.—Many features are combined in a really good site for a commercial or large ice house. Good ice in ample quantity, a porous soil, easy accessibility both from the water and land, proximity to market; also cheap and efficient transportation. Observance of the first and last of these points is imperative. Where natural drainage is lacking, the deficiency can be supplied, and access effected, in most instances, if the other features warrant the expense.

In selecting a site, when the lay of the land will permit, place the length of the house north and south, and arrange the incline and runs with as few turns as practicable. The ice cakes require assistance to keep them in motion on a crooked runway, and are constantly being jammed and spalled. On a direct run of proper pitch the cakes will travel without attention in freezing weather. On warm, sloppy days, when the ice is soft, it will require assistance. The platforms for winter shipments via rail come in for attention in placing the incline, which should be conveniently disposed for supplying them with ice cakes as fast as they can be handled. System and dispatch are the watchwords of the ice dealer while ice cutting is on.

Survey and Foundation.—The location and size of the house being determined, a survey is made and all lines staked out. It is important to have the foundations square and of the exact size, so that dimension lumber and roof trusses will fit as designed. Levels, also, call for attention, and the entire site should be brought to grade.

In the construction of foundations practice varies. They are partly dependent upon local conditions and climatic influences. For large houses, where the wastage is readily drained off and the sills are comparatively dry, they are about as durable as the balance of the building when placed directly on the ground.

The life of an ice house varies from so many causes, that no limit can be given applicable to all cases. When the lumber is well selected and the construction thorough, fifteen years of constant service will tell plainly on the building. If repairs are made as often as required, its term of usefulness is extended.