Ecuador
total: 966 km
narrow gauge: 966 km 1.067-m gauge (2004)
Egypt
total: 5,063 km
standard gauge: 5,063 km 1.435-m gauge (62 km electrified) (2004)
El Salvador
total: 283 km
narrow gauge: 283 km 0.914-m gauge
note: length of operational route reduced from 562 km to 283 km by
disuse and lack of maintenance (2004)
Eritrea
total: 306 km
narrow gauge: 306 km 0.950-m gauge (2004)
Estonia
total: 958 km
broad gauge: 958 km 1.520-m/1.524-m gauge (132 km electrified) (2004)
Ethiopia
total: 681 km (Ethiopian segment of the Addis
Ababa-Djibouti railroad)
narrow gauge: 681 km 1.000-m gauge
note: railway under joint control of Djibouti and Ethiopia (2004)
European Union total: 222,293 km broad gauge: 28,438 km standard gauge: 186,405 km narrow gauge: 7,427 km other: 23 km (2003)
Fiji
total: 597 km
narrow gauge: 597 km 0.600-m gauge
note: belongs to the government-owned Fiji Sugar Corporation; used
to haul sugarcane during harvest season (May to December) (2003)
Finland
total: 5,851 km
broad gauge: 5,851 km 1.524-m gauge (2,400 km electrified) (2004)
France
total: 29,519 km
standard gauge: 29,352 km 1.435-m gauge (14,481 km electrified)
narrow gauge: 167 km 1.000-m gauge (2004)