A 1st MAW record for combat sorties flown in a day by a single squadron was set on the 24th by VMF-212 with 12 flights and 46 sorties. Close support missions were about equally represented along with search and attack.[396]

[396] 1st MAW SAR, Annex Item:Roger.

Nightfall of this eventful day found 2/5 in possession of ground containing the most enemy dead in a small area ever seen in the Inchon-Seoul operation. Lieutenant Colonel Roise estimated that 1,500 NKPA bodies were left on Hill 56 and Smith’s Ridge, and the command of the 1st Marine Division put the figure at 1,750 enemy killed in the Hill 296 defenses.[397]

[397] Roise interv, 9 Nov 54; and O. P. Smith, Notes, 286.

Survivors of Dog Company agreed that in spite of such frightful losses, the Red Koreans had enough able-bodied men left at the finish to make mincemeat of the 26 attackers who took Smith’s Ridge. But this Marine effort seemed to break the heart of enemy resistance in the Hill 296 defense complex, thus giving fresh proof of Napoleon’s famous dictum, “The moral is to the material in war as three to one.”

River Crossing of RCT-1

The battle for Seoul entered its final stage on the 24th with the river crossing of the 1st Marines. At first light a site about 2,000 yards southwest of Hill 105-S was cleared by Charlie Company of the 1st Engineer Battalion. Extensive mine-clearing operations at the crossing site area caused delays, and it was 0800 when reconnaissance and assault elements of 2/1 embarked in the LVTs of Company A, 1st Amphibian Tractor Battalion. Sutter’s troops completed their crossing at 0945 against scattered and ineffectual fire, and made contact that afternoon on the north bank with elements of Company C, 5th Marines.[398]

[398] 2/1 SAR; and O. P. Smith, Notes, 268.

For lack of a ferry, the 1st Marines had no tank support at the crossing site. Plans had been made to send Baker Company, 1st Tank Battalion, around by the Haengju ferry to join the infantry north of the river. As it worked out, however, the armor was delayed by a fight on the north bank which will be discussed in the next chapter.

Hill 79, about 4,000 yards from the crossing site, had been assigned to the 1st Marines by Division OpnO 10-50 as an objective. The 2d Battalion began a rapid advance toward this point after moving into position on the north bank abreast of the 5th Marines on a 1,500-yard front.