The 1st Marines found little difficulty in carrying out all missions assigned by Division OpnO 14-50. In fact, the regiment had only a few minor patrol actions after taking blocking positions northeast of Seoul.

Colonel Litzenberg’s men were now making the main effort of the 1st Marine Division. Preparations for the drive to Uijongbu began with every indication that the enemy was bent upon flight. A patrol from the 3d Battalion found 30 Korean bodies beside a wall, including several women and a child, whose hands had been bound behind them before they were shot. The victims, according to a POW, were members of the families of ROK soldiers.[463]

[463] Ibid., Annex Roger Roger.

Positions had been consolidated by the late afternoon of 30 September in readiness for the jump-off in the morning. The 7th Marines might well have been called Task Force Litzenberg at this stage for it was reinforced by Major Parry’s 3d Battalion of the 11th Marines, Captain Lester T. Chase’s Company D of the 1st Tank Battalion, Captain Byron C. Turner’s Company D of the 1st Engineer Battalion, and Captain Kim’s Company C of the 5th KMC Battalion.

The drive to the new objective began at 0630 on 1 October in a column of battalions. Air reconnaissance had made it appear likely that any NKPA resistance would probably take advantage of a tactical bottleneck, about halfway to Uijongbu, where steep and rocky ridges overlooked a narrow defile through which the road passed. Colonel Litzenberg and his staff decided to maneuver by sending the 1st Battalion to make a broad feint to cover the entry of the 3d Battalion into the defile with tank support while the 2d Battalion followed in reserve.

Lieutenant Colonel Davis secured his preliminary objectives, then swiftly spread out on both sides of the defile for his feint. Unfortunately, Major Roach was delayed by an enemy mine field, which brought the 3d Battalion and the tanks to a halt while the engineers cleared the way. Davis’ simulated attack had meanwhile disclosed that the enemy was entrenched in depth along the high ground on each side of the defile. Both Marine battalions took heavy NKPA artillery and mortar fire before halting for the night.[464]

[464] This section is derived from: 1st MarDiv SAR, Annexes Oboe Oboe and Roger Roger; 1st MAW SAR, Annex Item:Queen; Col H. L. Litzenberg interv with HistDiv, 22 Apr 51; Hammond interv, 17 Aug 54; and Capt R. T. Bey interv, 17 Nov 54.

PURSUIT OF THE NKPA
&
CAPTURE OF UIJONGBU
28 SEP—3 OCT 1950

At least the day’s attacks had unmasked the enemy’s positions and exposed them to savage attacks by the Corsairs of VMF-312. RCT-7 continued the attack at 0630 on the 2d, with Roach on the left of the road and Davis on the right. About halfway through the defile the 3d Battalion was pinned down by a concentration of NKPA artillery, mortar, and small-arms fire. Again the tanks were held up while the engineers cleared away mines, working in a hail of bullets. The tanks of the 1st Platoon repaid the favor by closing in on two huts sheltering NKPA troops and killing an estimated 35. Here an attached dozer tank, without blade, had a freakish accident when two men in the turret were wounded by enemy fire down a 105mm gun tube while the breech was open.