Five hundred civilians were employed to help with the reconditioning of motor transport and other heavy equipment which had been “in mothballs” at Barstow since the end of World War II. Such items had to be put through the shops in many instances and restored to operating condition before delivery. The enormous supply depot in the California desert erupted with activity as trains of flatcars and long columns of motor trucks were routed to San Diego.

The actual loading and embarkation were conducted almost according to schedule in spite of such handicaps as inadequate dock facilities, the reception of supplies and equipment from a variety of sources, a shortage of stevedores, and piecemeal assignments of shipping. Only 54 stevedore crews were available out of the 90 requested, and commercial ships were necessary to supplement naval shipping. Nevertheless, the loading began on 8 August and was completed by the 22d. The following 19 ships were employed to mount out the main body of the 1st Marine Division:

LST 845; LSM 419; two APAs, the USS Noble and USS President Jackson; five APs, the USNS General Buckner, USNS General Weigel, USS Marine Phoenix, USNS General Meigs and USS General Butner; and ten AKs, the SS Dolly Thurman, SS Green Bay Victory, SS Noonday, SS African Patriot, SS Twin Falls Victory, SS Southwind, SS American Press, SS American Victory, SS Alma Victory, and SS Belgian Victory.[55]

[55] 1st Marine Division Special Action Report for the Inchon-Seoul Operation, 20 Apr 51, sec. 1. (Hereafter, 1st MarDiv SAR.)

Generals Shepherd and Cates arrived for the main embarkation on the 13th and 14th respectively, accompanied by Major General Franklin A. Hart and Brigadier General Edwin A. Pollock. While these general officers were being acquainted with the progress made so far, the AKA Titania blew out two boilers after being about 20 percent loaded. Since the repairs would require about ten days, a commercial freighter was provided as a last-minute replacement.

Build-up of 7th Marine Regiment

One of the purposes of General Shepherd’s visit was to discuss with General Cates the problems of organizing and embarking the 7th Marines (Reinf.). The activation of this unit had been directed on 10 August 1950, when an officer of the G-1 Section, Headquarters FMFPac, delivered orders to Camp Pendleton.[56]

[56] FMFPac Operation Order (Opn O) 3-50, 11 Aug 50.

This was the result of a change of mind on the part of the Joint Chiefs of Staff. After reconsideration, they decided that it would be feasible to raise a third RCT much sooner than had at first seemed possible, though not in time for MacArthur’s assault landing. Arrival in Japan about 20 September seemed to be the earliest date that could be managed.

Of the 17,162 eligible Marines at Camp Pendleton at that time, the regulars in excess of those required to mount out between the 10th and 15th were placed in the rear echelon of the division as a cadre for the third infantry regiment.[57] The following troops were made available to draw upon for the formation of the 7th Marines: