The main body of the 1st Marine Division troops landed at Kobe from 29 August to 3 September. Marine officers sent in advance to that seaport had found the authorities there “very cooperative” and brought back to Tokyo a billeting plan which General Smith approved. Since the facilities in and about Kobe were limited, two large APs were designated as barracks ships, thus making available a Marine labor pool at the docks.

At best, every hour was needed for the tremendous task of transferring cargo from merchant type shipping into assault shipping.[106] There was cause for anxiety, therefore, when a telephone message informed the command of the 1st Marine Division on 3 September that Typhoon JANE had struck Kobe with winds of 74 miles per hour. First reports had it that the Marine Phoenix was on the bottom with all of the Division’s signal gear. Several ships were said to have broken their moorings and gone adrift; the docks were reported under 4 feet of water, and loose cargo on the piers had been inundated by breakers.

[106] As a time-saving measure, it was decided to combat-load only the assault elements, allowing the other elements to go as organization loads. This was considered an acceptable risk in view of the enemy’s lack of effective air and submarine forces.

Later accounts proved to be less alarming. The Marine Phoenix, having merely developed a bad list as a result of shifting cargo, was soon righted. Nor was the other damage as serious as had at first been supposed. But 24 hours were lost from the tight reloading schedule while Typhoon JANE kicked up her heels, and time was one commodity that could not be replaced. All operations at Kobe had to be speeded up to pay for this delay.

On 4 September the Mount McKinley set sail for Kobe, arriving at 1445 the next day to be welcomed by an Army band at the pier. The soothing powers of music were needed by Marine officers who learned that fire had broken out in the hold of the Noonday as she belatedly approached Kobe. This “Jonah” had taken so long to load at San Diego that she lagged behind the others, and now large quantities of much-needed Marine clothing were apparently ruined by water when the fire was extinguished. Once again the Army came to the rescue with wholehearted cooperation by taking the water-soaked boxes to a reclamation depot where the garments were dried, repackaged and sent back to the docks in time for loading out on the originally scheduled ships.

Only the most basic troop training could be conducted at Kobe to supplement the individual and amphibious instruction the men had received on shipboard. At this time, moreover, an order from the Secretary of the Navy made it necessary to reduce the size of the landing force by withdrawing about 500 Marines who had not yet reached their 18th birthday. They were transferred to the 1st Armored Amphibian Tractor Battalion, which was to be left behind at Kobe when the Division embarked for Inchon.

This unit had been organized at Camp Pendleton in accordance with a directive from the Commandant. It was found necessary, however, to transfer most of its combat-ready men to the 1st Tank Battalion in order to bring that outfit up to full strength. The tank battalion was given priority because its vehicles would be used throughout the operation while the armored amphibians might be employed only occasionally. As a consequence, the 1st Armored Amphibian Tractor Battalion left San Diego with new personnel lacking in the skills to make it fully combat ready.

Lieutenant Colonel Francis H. Cooper, the commanding officer, recommended at Kobe that the unit be withheld from action until drivers, gunners, and maintenance crews could be properly trained. General Smith and his staff concurred, having learned that a trained Army unit, Company A of the 56th Amphibian Tractor Battalion, could be made available. Orders were given for Cooper’s battalion to remain at Kobe, therefore, with the 17-year-old Marines attached.

Several other U. S. Army units were to take part along with the Marines—the 96th Field Artillery Battalion, the 2d Engineer Special Brigade, the 73d Engineer (c) Battalion, the 73d Tank Battalion, the 50th Engineer Port Construction Company, and the 65th Ordnance and Ammunition Company. These units comprised a total of about 2,750 troops.

Plans called for the commanding officer of the 2d Engineer Special Brigade to head a logistical task organization which also included several Marine units—the 1st Shore Party Battalion, the 1st Combat Service Group, and the 7th Motor Transport Battalion. The Shore Party troops were to initiate unloading at the objective, whereupon the over-all control would pass to the 2d Engineer Special Brigade, on order, to insure continuity of development of unloading facilities.[107]