These were the forerunners of a total of 5,516 patients to be treated by the 1st Medical Battalion for all causes during the entire Inchon-Seoul operation. Most of them were WIA cases, but such ailments as acute appendicitis, hernia, piles, and sprains are also recorded.

Of the 2,484 surgical patients, only nine died after reaching the first aid station, and among them were six deaths following major surgery. The proportion of patients surviving after evacuation, therefore, reached the figure of 99.43 per cent. This meant that the chances were about 199 to 1 that a wounded Marine would live.

Artillery and Tank Operations

The planners, anticipating the need of artillery support for the assault on the mainland, had hoped that DUKWs could land two battalions of Colonel James H. Brower’s 11th Marines on GREEN Beach for this mission. There was some reason to believe that these vehicles could cross the mud flats at low tide, thus enabling the 105s to get in position on Wolmi-do and registered before the Inchon landing. In the end, however, it was decided that this plan was not feasible, and the 1st and 2d Battalions of the artillery regiment landed on the evening tide while the rifle regiments were hitting the beaches at Inchon. A delay of an hour and a half occurred as a result of the confused maneuvering of ships in the inner harbor. It was not until 2150, therefore, that the 1st and 2d Battalions were prepared to deliver massed fires in support of the 5th and 1st Marines respectively.[179] Fortunately, the lack of this support at H-hour had not been a grave handicap in view of the light resistance encountered on the beaches.

[179] The 3d Battalion, 11th Marines, was attached to RCT-7 and had not yet landed at Inchon.

Low visibility and lack of targets limited the fires to a few rounds the first night. Next day the artillery landing was completed when 4/11 went ashore on RED Beach, followed on D-plus 2 by the 96th Field Artillery Battalion, USA. Plans for the drive inland called for 1/11 and 2/11 to fire in direct support of RCT-5 and RCT-1 respectively. Support was to be provided by 4/11 for RCT-5 and by the Army battalion for RCT-1.[180]

[180] 1st MarDiv SAR, Annex Sugar Sugar.

The problems of tank support for the Inchon operation had given the planners many a headache. BLUE Beach was dismissed from consideration because of the mud flats, and the possibilities at RED Beach were not encouraging. GREEN Beach offered the best prospects for landing tanks, though it was recognized that they would be stranded if the enemy destroyed the causeway connecting Wolmi-do with the mainland.

The consequences of the hasty embarkation from Camp Pendleton had borne down heavily upon the 1st Tank Battalion, commanded by Lieutenant Colonel Harry T. Milne. Crews trained with the M-4A3 (Sherman) and 105mm howitzer were suddenly equipped with the M-26 (Pershing) and its 90mm gun. With the exception of Company A, which saw action with the Brigade, few of the men had had any experience either at driving or firing the new tanks. The flame tank platoon of Headquarters Company had received some training at Barstow, but most of the personnel of Baker, Charlie, and Dog Companies were limited to shipboard instruction.

The men of the Company A platoon which landed on GREEN Beach in support of 3/5 were veterans of several fights with NKPA tanks and infantry in the Pusan Perimeter. In the evening of D-day they supported the landing on RED Beach and moved across the causeway to the mainland at dusk. There they joined the other two platoons of Able Company and the flame tank platoon, which landed with the LSTs in support of the 5th Marines.