After setting up hasty defenses, Davis directed that all dead and wounded be evacuated to 3/5’s aid station on the road. How Company was attached to his battalion by order of Colonel Litzenberg, since all units had been thinned by casualties. Then the battalion tail was pulled up the mountain and the last physical tie broken with other Marine units in the Yudam-ni area.[518]

[518] 3/7 SAR, n. p.; R. G. Davis narrative, 11 Jan 53; Fridrich interv, 21 Apr 56; CO 7thMar msg to CG 1stMarDiv, 1935 1 Dec 50; LtCol R. G. Davis interv by Capts K. W. Shutts and A. Z. Freeman, 6 Apr 51; Maj E. M. Hovatter Comments, 19 Jul 56.

The Marines had seized the initiative, never again to relinquish it during the Chosin Reservoir campaign.

March of 1/7 Over the Mountains

Planning at the battalion level was done by Davis, his executive officer, Major Raymond V. Fridrich, and his S-3, Major Thomas B. Tighe. It was decided to take only two of the 81mm mortars and six heavy machine guns. They were to be manned with double crews, so that enough ammunition could be carried to keep them in action.

Pack-set radios (AN/GRC-9) were to provide positive communications in case the portable sets (SCR-300) would not reach to the Yudam-ni perimeter. The artillery liaison officer was to carry a pack set (SCR-610) to insure artillery communication.[519]

[519] This section, except when otherwise noted, is based on Davis narrative; Litzenberg interv, 27–30 Apr and 10 Jul 51; Fridrich interv, 21 Apr 56; R. G. Davis interv, 6 Apr 51; and Capt W. J. Davis interv, 4 Jun 56.

All personnel not sick or wounded were to participate, leaving behind enough walking wounded or frostbite cases to drive the vehicles and move the gear left behind with the regimental train. Extra litters were to be taken, each serving initially to carry additional mortar and machine gun ammunition; and all men were to carry sleeping bags not only for the protection of the wounded but also to save their own lives if the column should be cut off in the mountains for several days. Every man was to start the march with an extra bandolier of small arms ammunition, and personnel of the reserve company and headquarters group were to carry an extra round of 81mm mortar ammunition up the first mountain for replenishment of supplies depleted at that point.

After driving the enemy from the topographical crest of Hill 1419, the four companies were not permitted a breathing spell. Davis feared the effects of the extreme (16 degrees below zero) cold on troops drenched with sweat from clawing their way up the mountain. He pressed the reorganization with all possible speed, therefore, after no enemy contacts were reported by patrols ranging to the southeast. And at 2100 on the night of 1 December the column set out in this order:

Baker CompanyFirst Lieutenant Kurcaba
1/7 Command GroupLieutenant Colonel Davis
Able CompanyFirst Lieutenant Hovatter
Charlie CompanyCaptain Morris
Headquarters GroupMajor Fridrich
How CompanySecond Lieutenant Newton