Division Planning for Attack

On the assumption that the gap over the penstocks would be successfully spanned, the 1st Marine Division issued OpnO 26-50 at 1850 on 7 December. Although the last operation order had specified the Hamhung area as the objective, it was found necessary at Koto-ri to give more explicit instructions for the advance to the southward.

The plan was simple. Recognizing the sharp cleft of Funchilin Pass as the most difficult defile of the entire breakout, General Smith ordered the seizure of the heights overlooking the pass from the north end of Hill 1081, dominating the road through the pass. In its details the plan shaped up as follows:

(1) RCT-7 (reinforced with the Provisional Army battalion) to attack south from Koto-ri at 0800 on 8 December and seize Objectives A and B—the first being the southern extension of Hill 1328, about 2500 yards southwest of Koto-ri, and the other the second nose due south of Koto-ri.

(2) RCT-5 to attack and seize Objective D (Hill 1457, two and a half miles south of Koto-ri) while RCT-7 continued its attack and seized Objective C (a nose dominating the MSR two and three-fourths miles south of Koto-ri).

(3) At 0800, as RCT-7 jumped off at Koto-ri, the 1st Battalion of RCT-1 was to attack from Chinhung-ni and seize Objective E (Hill 1081, three miles to the north).

(4) RCT-1 (less the 1st Battalion but reinforced by 2/31) was to protect Koto-ri until the Division and regimental trains cleared, whereupon it was to relieve RCTs 5 and 7 on Objectives A, B, C and D.

(5) Upon relief by RCT-1, RCTs 5 and 7 were to proceed south along the MSR to the Hamhung area.

(6) RCT-1 was to follow RCT-5 and protect the Division rear.[588]

[588] 1stMarDiv OpnO 26-50, 7 Dec 50. The task organization remained as it was during the move from Hagaru to Koto-ri. For the regimental orders, see 1stMar OpnO 16-50, 7 Dec 50; 5thMar OpnO 44-50, 7 Dec 50; and 7thMar Frag O, 7 Dec 50. Other sources for this section are: 11thMar SAR, 9; and Smith, Notes, 1062.