Litzenberg’s plan for the seizure of the heights overlooking the northern entrance to Funchilin Pass provided for the Army Provisional Battalion to take Objective B. The soldiers jumped off at 0800, on the left of the MSR, supported by two tanks of the 5th Marines AT Company. By 0900 the battalion had secured its objective without meeting any resistance. Litzenberg then ordered a further advance of 800 yards to the northwestern tip of Hill 1457. At 1330 the Army troops secured their second objective, still without resistance and tied in with 1/5 for the night.[592]

[592] FSCC tel to G-3, X Corps, 1245 8 Dec 50 in G-3 Journal; X Corps CR, 8 Dec 50; RCT-7 URpt 6; 7thMar SAR, 25; 3/7 SAR, n. p.; MajGen H. L. Litzenberg Comments, 17 Nov 56; LtCol W. Morris Comments, 15 Oct 56.

Lieutenant Colonel Davis having become regimental executive officer after Dowsett was wounded, Major Sawyer took over command of 1/7. His plan called for the battalion to advance about 2000 yards down the road and wait for 3/7 to come up on his right flank. Then the two battalions would move along together.

The 1st Battalion jumped off at 0800 and reached its phase line without opposition. First Lieutenant Bobbie B. Bradley’s platoon advanced down the road to gain contact with the Chinese while the remainder of the battalion halted. When 2/7 began its attack in support of 3/7, Sawyer’s battalion moved out. Bradley’s patrol having run into opposition from the northern reaches of Hill 1304, Companies A and C moved west of the MSR in a double envelopment of the enemy position. Company B continued the advance towards Objective C, meeting a heavy cross fire from Chinese to their front and on Hill 1304. Lieutenant Kurcaba was killed and Lieutenants Chew Een Lee and Joseph R. Owen wounded. First Lieutenant William W. Taylor took command and managed to clear the enemy from his front just before dusk.

Able and Charlie Companies faced less resistance in overrunning the foxholes and two bunkers on Hill 1304. With dusk falling, Sawyer did not attempt a further advance. Able and Charlie Companies dug in on Hill 1304 while Baker set up a perimeter slightly short of Objective C. The first serials of the truck convoy had moved closely on the heels of 1/7 and had to be backed up to a level area near Objective A. There they formed a perimeter reinforced with H&S and Weapons Companies of 1/7.[593]

[593] 7thMar SAR, 25; RCT-7 URpt 6; CO 1/7 msg to CO 7thMar, 1341 8 Dec 50; Geer, The New Breed, 362–363. LtCol W. D. Sawyer Comments, 26 Oct 56.

Division OpnO 26-50 had directed Lieutenant Colonel Murray’s RCT-5 to await orders before attacking Objective D. It was nearly noon on the 8th before the 1st Battalion, in assault, was directed to move out from Koto-ri.

Lieutenant Colonel Stevens followed the MSR for a mile, then sent two companies out to the left to occupy the objective, Hill 1457. Baker Company seized the intervening high ground and set up to cover the attack of Charlie Company up the slopes of the ridge leading to the objective. Charlie Company fell in with a patrol from the Army Provisional Battalion attached to the RCT-7, and the two combined forces to drive the enemy off the high ground about 1550. A weak Chinese counterattack was easily repulsed, and at 1700 as darkness fell Baker and Charlie Companies tied in with the Army troops while Able Company formed its own perimeter overlooking the MSR. In reserve, the 41st Commando moved into the high ground behind 1/5 to guard against infiltration.[594]

[594] 1/5 SAR, 19; S-3 5thMar tel to G-3 1stMarDiv, 1800 8 Dec 50; Maj Stewart tel to CO 5thMar, 1940 8 Dec 50; 5thMar SAR, 34; Smith, Notes, 1072.

The day’s story would not be complete without reference to the Treadway bridge train, which moved out about 1400 on the 8th in the trace of 1/7. Instructions were to install the sections at the first opportunity, but the site had not been secured as darkness approached. A few Chinese mortar rounds falling in the vicinity of the vulnerable Brockway trucks influenced a decision to return them closer to Koto-ri.[595]