[271] Sources are 1stMarDiv HD, Aug 51, 3–5; Col B. T. Kelly’s contemporary “Notes on my Service in Korea, 14 Apr-13 Sep 1951” (hereafter Kelly, Notes).

It took the rest of the night for the 3/7 officers to walk the length of the convoy, cutting out trucks with less essential cargo. With only a small space available for a turn-around, the 3/7 vehicles were ordered to back into it, unload their troops and equipment, and return along a narrow road, which had been churned into a quagmire.

The battalion assembly area was on the other side of the rain-swollen Soyang. How Company and the command group managed to cross over a waist-deep ford, but the crossing was so perilous that DUKWs were requested for the other two rifle companies. Lieutenant Colonel Louis C. Griffin’s 2/7 also found the river crossing an operation requiring DUKWs. By the afternoon of the 29th all elements of the two 7th Marine battalions were on the west bank, occupying their assigned assembly areas.

The relief proceeded slowly. Two KMC battalions on the left of the 7th Marines took over the zone formerly held by elements of the 2d Infantry Division and the 8th ROK Division. The cosmopolitan character of the Eighth Army was revealed when 2/KMC relieved the French Battalion of the 2d Infantry Division. Linguistic chaos was averted only by the best efforts of the exhausted interpreters.

By the 30th, the 1st and 3d KMC Battalions were behind the line of departure on Hill 755, ready to attack in the morning. The 2d Battalion assumed responsibility for the regimental zone on the KANSAS Line.

The 2d and 3d Battalions of the 7th Marines had meanwhile completed the relief of elements of the 8th ROK Division. On the other side of the river Lieutenant Colonel James G. Kelly’s 1/7 had relieved units of the ROK division on the hill mass a mile and a half north of Tonpyong ([Map 17]). These Marines were first to come under fire as the enemy sent over a few mortar rounds after dark on the 29th.

Division OpnO 22-51 directed the two assault regiments, the 7th Marines and KMCs, to attack at 0600 the following morning and seize their assigned positions on Corps Objective YOKE, the ridgeline running from Hill 930 on the west through Hills 1026 and 924 on the east ([Map 17]). Objective 1, the hill mass 1½ miles northeast of Tonpyong, was already occupied by 1/7.

The 3d Battalion, 7th Marines, was ordered to seize Objective 2, generally that part of YOKE Ridge east of Hill 924. The KMC Regiment was assigned Objective 3, consisting of Hills 924 and 1026.

Other 1st Marine Division units had the following missions on 31 August:

5th Marines—to patrol the Division zone along the KANSAS Line and protect defensive installations;