The 2nd Battalion, 5th Marines estimated that wire rolls, sandbags, timbers, and other materiel “recovered by this battalion and assisting units was valued at approximately $150,000.”[666]

[666] 2/5 Hist, in 5thMar Hist, dtd 12 Dec 53, p. 3, Folder #4.

By early September, the 1st Marine Division work priority once again had reverted from camp construction to salvage operations. It had become apparent that another maximum effort period would be necessary if all salvageable materials were to be removed from the DMZ no later than the 13 September deadline reaffirmed by I Corps on 2 September. During this last phase of salvage work, participating battalions again came under operational control of the 5th Marines. Elements of the 1st and 11th Marines, neither of which at that time had a sector of responsibility for salvage, as well as KMC troops, augmented the organic units. One battalion alone, 1/1, detailed 400 men in work parties. At 2130, on 13 September, the division completed its salvage mission in the Demilitarized Zone, thus meeting the specified time limit. Under terms of the armistice agreement, after 13 September all personnel were prohibited from entering the Korean Demilitarized Zone. The only exceptions were members of the DMZ police companies of the Allied and Communist sides and other persons specifically authorized passage by the Military Armistice Commission (MAC).

Control of the DMZ and the Military Police Company[667]

[667] Unless otherwise noted, the material in this section is derived from: 1stMarDiv G-3 Jnls, 30 Jul-31 Aug 53; Demilitarized Zone Police Co Rpt, dtd 18 Dec 53, in 5thMar Hist, Folder #4; MSgt Paul Sarokin, “DMZ Marines,” Leatherneck, v. 37, no. 10 (Oct 54), hereafter Sarokin, “DMZ Marines.”

Since the late July signing of the armistice, one of the missions of the 5th Marines GOP regiment had been the marking, control of entry, and policing of the DMZ. At the time the No-Pass Fence was constructed, roadblocks, called “crossing stations” were located at each route leading into the DMZ. Initially, 21 crossing stations were opened across the regimental front. When it later became apparent that not all of these security points would be needed, some were closed and the roads barricaded. Each crossing station was manned by a minimum of two sentries who insured that no weapons were carried into the DMZ. Along the fence itself, signs printed in three languages prohibited unauthorized entry into the southern boundary of the DMZ. On roads and trails approaching the southern boundary fence, additional signs placed 200 yards from the fence warned of the proximity to this southern end of the military zone. Air panels and engineer tape also marked the DMZ.

After 31 July, entry into the DMZ was limited to those persons holding a valid pass, issued under the auspices of the Military Armistice Commission. Authority was also delegated to CG, U.S. I Corps to issue passes for the I Corps sector. With salvage operations requiring a large number of passes, authority was further delegated to the CO, 5th Marines, to issue permits for the regimental sector, good only for unarmed[668] working parties engaged in salvage operations. The regimental S-2 established a pass control center, and anyone desiring to enter the DMZ made application through that office. Each pass contained the bearer’s name, rank, service number, organization, number of personnel and vehicles in the working party, and reason for entry.

[668] With the exception of the DMZ Police, all persons entering the DMZ for salvage were required to check their weapons at the zone entry.

Security procedures also required that a log book of all zone entries and exits be kept by crossing station guards. This information was ultimately telephoned or radioed to higher echelons. At battalion and regimental levels a master log or “status board” indicated the number of people, vehicles, passes, and pass identification numbers present in the DMZ at all times. As the salvage program reached its height in August and early September, just the “issuance and recording of passes and the checking of the working parties into the zone became a major operation.”[669] Between 4 August-13 September, a total of 3,523 vehicle passes and an unknown number of personnel permits were issued. With the ending of salvage operations on 13 September, the Marine regiment no longer issued DMZ passes, although I Corps continued to authorize MAC personnel entry permits.

[669] 5thMar Hist, p. 2, Folder #3.