That the Navy was willing to give this much attention to so honored a ship as Hartford is understandable. But it symbolized the fact that it was only putting off the inevitable—modernization. By the early 1880s the U.S. Navy floundered in the wake of Europe’s navies—the victim of limited funds, tradition-bound officers, political neglect, and popular indifference. There were but 48 decaying vessels in commission, most at a Civil War or even prewar level of technology. On top of the other problems, the corruption associated with the administration of Ulysses S. Grant had touched the Navy—including the Charlestown yard—in the late 1870s. Here, as at other yards, politicians found jobs for men who were then expected to vote as they were told. It is easy to see why one historian has characterized this period as the “low water mark” of the Navy.

There were rumors of yard closings. Nothing happened immediately, but less and less work came to Charlestown. Then, in 1883, the Navy suspended all repair and construction work at the yard and reduced its role to manufacturing. So began hard times at Charlestown Navy Yard, during which it came perilously close to shutting down altogether.

Continues on [page 45]

The Yard’s First Dry Dock

Before dry docks came into use in the 16th century, the only way to service a ship’s hull was to “careen” it—heave it over on its side, still floating (see pages [6-7]), or laying in the mud at low tide. It was difficult and time-consuming and put great strain on the hull. The answer was the dry dock. The concept is simple: float the vessel into a three-sided basin, then close the seaward end and remove all the water. The vessel settles on a cradle, its hull accessible. To undock: reflood the basin, open the seaward end and float the vessel out. But the concept’s execution required a finely-engineered complex of masonry, engines, pumps, reservoir, tunnels, culverts, valves, and gates—in effect a huge well-coordinated machine. The Charlestown dry dock and the one built concurrently at Norfolk, Va., were the first such naval structures in the country. Six years under construction, the Charlestown dock was inaugurated in 1833 with the docking of Constitution. It was 305 feet long (extended in 1856 to 370 feet and again in 1948 to 398 feet), 60 feet wide, and 30 feet deep—the Navy’s largest dry dock until the 1890s. It took the original eight pumps four to five hours to empty the tremendous basin. Other operations were to some extent governed by Boston Harbor’s 10-foot tide. After the dock was enlarged the water level did not rise as rapidly as the tide during filling, so it took two high tides to do the job. For emptying and filling, the caisson was filled with water and sunk in place between grooves in the dock walls. For docking and undocking, the caisson was emptied and floated out of the way on the high tide (see inset). It took 24 men working hand pumps for an hour and a half to expel the water from the caisson. The original wooden caisson lasted until 1901, when the steel caisson still in use today was completed.

1. After its 1858 launching, U.S.S. Hartford is docked for installation of its steam engine. To empty the dock, workers opened the discharge gates (A), releasing water to flow (red arrows) down discharge culverts (B) (on both sides of dock) to fill the reservoir (C).

2. The pumphouse (D), its steam engine driving two pumps in underground wells (E), pumped the water from the dock via the reservoir and sent it through an underground culvert back to the harbor.

3. To fill the dock, the discharge gates were closed and the filling gates (F) were opened. Water flowed (green arrows) first to wells (G), then into the dock through the same culverts used to empty it.

Steam windlass Timber dock Swing gates (backed up caisson) Caisson (“floating gate”)