To have a uniform slope when the tents are pitched, the guy ropes should all be of the same length.

In shelter-tent camps, in localities where suitable material is procurable, tent poles may be improvised and used in lieu of the rifle and bayonet or intrenching tool as supports for the shelter tent. (C.I.D.R., Nos. 2, 5 and 8.)

[794.] When the pack is not carried the company is formed for shelter tents, intervals are taken, arms are laid aside or on the ground, the men are dismissed and proceed to the wagon, secure their packs, return to their places, and pitch tents as heretofore described.

[795.] Double shelter tents may be pitched by first pitching one tent as heretofore described, then pitching a second tent against the opening of the first, using one rifle to support both tents, and passing the front guy ropes over and down the sides of the opposite tents. The front corner of one tent is not pegged down, but is thrown back to permit an opening into the tent.

Single Sleeping Bag.

[796.] Spread the poncho on the ground, buttoned end at the feet, buttoned side to the left; fold the blanket once across its short dimension and lay it on the poncho, folded side along the right side of the poncho; tie the blanket together along the left side by means of the tapes provided; fold the left half of the poncho over the blanket and button it together along the side and bottom.

Double Sleeping Bag.

[797.] Spread one poncho on the ground, buttoned end at the feet, buttoned side to the left; spread the blankets on top of the poncho; tie the edges of the blankets together with the tapes provided; spread a second poncho on top of the blankets, buttoned end at the feet, buttoned side to the right; button the two ponchos together along both sides and across the end.

To Strike Shelter Tents.

[798.] The men standing in front of their tents: STRIKE TENTS.