(7) To complete installation, follow procedure outlined in step b (1) through (4) above.
10—INSTRUMENT PANEL TERMINAL.
12—BATTERY POSITIVE.
13—BATTERY NEGATIVE (GROUND).
18—TERMINAL JUNCTION ON FRAME.
26—IGNITION—LIGHT SWITCH.
28—SPARK COIL.
(7) To complete installation, follow procedure outlined in step b (1) through (4) above.
10—INSTRUMENT PANEL TERMINAL.
12—BATTERY POSITIVE.
13—BATTERY NEGATIVE (GROUND).
18—TERMINAL JUNCTION ON FRAME.
26—IGNITION—LIGHT SWITCH.
28—SPARK COIL.