Another passenger who travelled by the 6·50 Great Western up-train from Plymouth on Monday returned by a somewhat roundabout route, and he thus described his experiences: Hemerdon was reached without any delay on the journey, but at that point the train was drawn up for about three-quarters of an hour, to allow a down train to pass. It then proceeded slowly in face of a terrific gale, accompanied by blinding snow. After leaving Cornwood, a grating sound on the roof of the carriage suggested broken wires, and this was followed by a jerk and a stoppage, and the interesting announcement that one coach and the engine were off the rails, and embedded in a snowdrift. There was nothing for it but to wait, and the "wait" lasted the whole night. There was nothing to eat for anybody, and the forty or more passengers (amongst whom were several ladies) had to make their night watches as comfortably as was possible under the circumstances in the Langham cutting! It seems that the driver and one of the guards succeeded in reaching Ivybridge, about a mile away, in the late evening, but no notice of the proximity of the village was given to the passengers. On Tuesday morning a small party from Ivybridge, under Messrs. Brown and Greenhough, two engineers superintending the alterations to the line in the neighbourhood, came to the rescue of all who were willing to face the blinding storm. Only four consented to go, and they were very thankful to exchange the cold comfort of the railway carriage for the hearty hospitality offered by these gentlemen in Ivybridge.

The officials here do not seem generally to have been equal to the exigencies of the situation, no notice of their whereabouts being given to the passengers, nor any organised attempt made at rescue or provisioning, but a porter and a packer from Ivybridge station arrived about daybreak with whisky and brandy. When the four passengers referred to were leaving at about 9·30 on the Tuesday morning, bread and butter and tea were being dispensed. Many of the remaining passengers were hospitably accommodated by Miss Glanville at her house close to the half-buried train, the ladies being assisted thither by the engineers and their party. Another train was detained at Ivybridge Station, and the passengers from it were lodged in the village.

In West Cornwall three trains were snowed up. The train which left Plymouth at five o'clock on Monday night and should have reached Penzance at 8·45, arrived there at eleven. The "Dutchman" which should have, in the ordinary course of things, followed within fifteen minutes of this train, did not arrive at all, and news soon reached Penzance that the fast train was snowed up, but in what spot was only ascertained with much difficulty. A train was at once got ready, and on it Mr. Blair, the station-master, Mr. Ivey, the superintendent of the locomotive department, Mr. Glover, and a breakdown gang, proceeded to Camborne, which was reached about noon on Tuesday, it having taken about nine hours to accomplish a journey of thirteen miles. All the way along huge drifts of snow were met with, completely blocking the passage, and at frequent intervals the way had to be literally cut through the drifts by the men of the breakdown gang. Thus, with great difficulty, Hayle was reached, and from thence to Camborne the task became almost overpowering. Here the open country favoured the accumulation of snow, and the drifts were immense. In a deep cutting, close to Gwinear Station, was encountered a drift of about eighty yards long and nine feet deep.

On at length reaching Camborne it was discovered that the missing 8·45 train had left Redruth at about ten o'clock on Monday night—an hour and a half late. The storm was then at its height, and the snow was driving with such force that only very slight progress could be made. The train passed Carn Brea safely, but when within sight of Camborne Station, close to Stray Park, the engine left the metals, running on the south side, and finally bringing up at a hedge against which it lay on its side. Fortunately, at the time of the occurrence, speed was slow, and nothing more serious than some damage to the rolling stock, and the inconvenient detention of the twenty or thirty passengers occurred. These included five ladies, who were taken to the house of Mr. Maurice Reed, the Station Master at Camborne, the gentlemen of the party having good opportunities of finding comfortable quarters in the hotels of the town. Another train was embedded in fifteen feet of snow on the Helston branch line from Gwinear Road to Helston, and the guard, engine-driver, and stoker, with their one passenger, were compelled to abandon the train and seek shelter in a neighbouring farm-house.

While great inconvenience and discomfort was caused by the blizzard on the Cornish railways as a whole, no fatalities were reported, and the work of clearing the lines, great and arduous as it was, was accomplished in less time than in the districts above Plymouth, and in the vicinity of Dartmoor. Communication between Plymouth and Cornwall was opened up some days earlier than that with Totnes, Exeter, and other towns. The scene here depicted shows the depth of snow in this neighbourhood, and is from a photograph by A. Leamon, Esq., of Liskeard.

MAIN ROAD BETWEEN LISKEARD AND TORPOINT.

Above Exeter things were not so bad. In the Tiverton district the effects of the blizzard were rather severely felt, and communication between some towns was for the time cut off. The railway authorities were very active, and gangs of men were sent up from Exeter on Tuesday to clear the lines, but they could do little more than keep the points clear for shunting, watch the signals, and fix detonators where required, the driving snow being so blinding, and the coldness of the bitter wind so intense. The difficulties of the neighbourhood commenced on Monday evening at the Whitehall tunnel, when the pilot, in front of the express, got off the line. Daylight came before a gang of packers sent from Taunton could effect a clearance, and instead of passing at ten o'clock on Monday night, the express only struggled into Tiverton Junction, with two engines attached, at half-past six on Tuesday morning. The night mail, and the North mail followed some hours after, and managed to get through to Exeter, but after that, until Wednesday morning at eleven o'clock, no train could leave the junction.