All ranks received a good reception from the villagers, and the next few days were spent in resting, inspections and training. Considerable time was taken up in making duck-boards from the smaller trees of a wood near the village until this exercise was stopped by the forester. A few secured the grant of leave to Amiens, a privilege greatly enjoyed. The work of the organisations home in Glasgow and the interest taken in the Regiment and the men of the 17th Battalion soon became manifested by the arrival of parcels to such an extent that the postal arrangements were severely strained!
TRENCH ROUTINE.[ToC]
In the line—Xmas '15 and the New Year—the new trench—"Standing to"—routine and patrols.
The Battalion returned to the line from Molliens-au-Bois on 23rd December, 1915, and from then till 17th February, 1916, held the Sector F1 alternately with the 11th Border Regiment. The outstanding features of this period were the digging and then the taking over of the new trenches across the big re-entrant on their right on 2nd February, and the enemy raid on the 2nd K.O.Y.L.I., on their left on 9th February.
It will be noted that this spell of trench warfare activities brackets in both Christmas and New Year—both of which were accordingly spent in the front line trenches. As far as possible Christmas fare was provided in the line, and strict orders were issued that if the enemy made any friendly offers they were to be rejected strenuously. The only exchange of greetings notified for Christmas and New Year in the Official War Diary of the Battalion is a brief record of shelling and machine gunning. But during this period the Battalion had nevertheless very few casualties—only seven killed, including two died of wounds. The first casualty was Corporal Houston of No. 16 Platoon, who was killed at Lower Donnet on 3rd January.
Except for patrol work, the piece of work carried out on 2nd February, 1916, in connection with the new trenches was the first military operation carried out by the 17th when in close touch with the enemy, and it was confined to "B" Company and a Platoon of "A" Company, who acted as covering party.
For some time the Battalion had been exercised in night manœuvres, and on 1st February they had a full-dress rehearsal of the impending operation, which, on Tuesday, 2nd February, came off sooner than had been anticipated. The scheme was to form a new line of trenches, protected by wire, nearer the German line, some 300 yards in front of the existing one, the length dug being about 600 yards, with communication trenches in addition.