Inspection of Front Axle after Machining

At the end of the line the complete chassis is driven out into the yard under its own power. Guided by practiced hands it moves swiftly out into the yard, turns sharply and enters the final inspection line. A corps of inspectors at this point takes charge of the chassis, and the responsibility for each part is assigned to some one man.

From the final testing line the chassis is driven to the body chutes, which extend into the factory yard from the third floor of the new six-story building, and are so constructed that the chassis may be driven under them. The bodies are let down the chutes on belt conveyors, picked up by small derricks and swung over onto the chassis. The bodies are at this time placed on the chassis merely as a means of a rapid transportation to the freight cars, for in ordinary transportation the bodies are packed in the cars separate from the chassis.

In the rear of the main plant are two six-story buildings each 60 feet wide by 845 feet long, built parallel to each other and connected by a crane-way 40 feet wide the full length and height of the buildings.

The boiler house, which furnishes the steam for heating the entire plant, is located in the rear of these buildings. The method of heating is worthy of particular interest, as the air is forced over coils of steam pipes located in pent houses on the roofs, and from this point is driven down into the various rooms through the hollow columns which support the floors. In the summer, cool washed air is forced down through these same columns, maintaining a normal, even temperature, compatible with the state of the weather.

Installing Motor on Final Assembly Line

Various unit assemblies, small machine departments, and store rooms are located here in addition to all the body work.

Practically the entire first floors are used as a receiving department, where all the material consigned to the company is checked and inspected. Railway tracks run the full length of both crane-ways, facilitating the unloading and loading of supplies and parts.