The date of the attack on Beersheba, which was to commence the operations, was fixed as October 31, 1917. Work had been begun on the railway from Shellal towards Karm, and on the line from Gamli to El Buggar. The development of water at Ecani, Khalasa, and Asluj proceeded satisfactorily. These last two places were to be the starting point for the mounted force detailed to make a wide flanking movement and attack Beersheba from the east and north-east.

The Turks make a strong reconnaissance.

On the morning of October 27 the Turks made a strong reconnaissance towards Karm from the direction of Kauwukah, two regiments of cavalry and two or three thousand infantry, with guns, being employed. They attacked a line of outposts near El Girheir, held by some Yeomanry, covering railway construction. One small post was rushed and cut up, but not before inflicting heavy loss on the enemy; another post, though surrounded, held out all day, and also caused the enemy heavy loss. The gallant resistance made by the Yeomanry enabled the 53rd (Welsh) Division to come up in time, and on their advance the Turks withdrew.

Bombardment of Gaza defenses.

The bombardment of the Gaza defences commenced on October 27, and on October 30 warships of the Royal Navy, assisted by a French battleship, began cooperating in this bombardment.

On the evening of October 30 the portion of the eastern force, which was to make the attack on Beersheba, was concentrated in positions of readiness for the night march to its positions of deployment.

Imperial Camel Corps, Infantry and Cavalry.

The night march to the positions of deployment was successfully carried out, all units reaching their appointed positions up to time. The plan was to attack the hostile works between the Khalasa road and the Wadi Saba with two divisions, masking the works north of the Wadi Saba with the Imperial Camel Corps and some infantry, while a portion of the 53rd (Welsh) Division further north covered the left of the corps. The right of the attack was covered by a cavalry regiment. Further east, mounted troops took up a line opposite the southern defences of Beersheba.

Enemy's advanced works taken.

As a preliminary to the main attack, in order to enable field guns to be brought within effective range for wire-cutting, the enemy's advanced works at 1,070 were to be taken. This was successfully accomplished at 8.45 a.m., after a short preliminary bombardment, by London troops, with small loss, 90 prisoners being taken. The cutting of the wire on the main line then proceeded satisfactorily, though pauses had to be made to allow the dust to clear; and the final assault was ordered for 12.15 p.m. It was successful all along the front attacked, and by about 1 p.m. the whole of the works between the Khalasa road and the Wadi Saba were in our hands.