The advanced guard as constituted for this operation consisted of the 59th Brigade, the 59th Machine Gun Company, one section of the 217th Machine Gun Company, the whole of the Divisional Artillery, and two sections of the 83rd Field Company R.E.

The operation was divided into two phases:

1. At zero (2 P.M.) an advance on the right of two battalions (the 10th K.R.R.C. on the right and the 11th K.R.R.C. on the left) to capture and hold the first objective, Metz-en-Couture.

2. At 3.25 P.M. an advance on the left of one battalion (the 11th R.B., with one company of the 10th R.B.) to capture the second objective, the enemy’s trench from the north-west corner of Metz to the south-west corner of Havrincourt Wood.

The 60th Brigade and one section of the 217th Machine Gun Company were to assist by bringing machine-gun fire to bear on the south-west corner and the west side of the wood from all available guns which could be assembled in Neuville.

The 12th King’s moved up into the line on the 3rd to enable the whole of the 59th Brigade to attack. By the morning of the 4th, battalions were disposed as follows:

10th K.R.R.C. (Lieut.-Colonel Ley) in Dessart Wood.

11th K.R.R.C. (Lieut.-Colonel Priaulx) at Fins.

10th R.B. (Lieut.-Colonel Troughton) holding a line about 1500 yards south-west of Metz, facing the village.

11th R.B. (Lieut.-Colonel Cotton) prolonging this line to a point 400 yards south-east of Neuville.