Jamb.—Window and door jambs should always be of dressed stone, both on account of the extra strength thus gained and in order to give a finish to the work. The stones are laid alternately as stretchers and headers; the former are called outbands, the latter inbands (fig. 7).

Label Moulding, a projecting course of stone running round an arch. When not very large it is sometimes cut on the voussoirs, but is usually made a separate course of stone. Often, and especially in the case of door openings, a small sinking is worked on the top surface of the moulding to form a gutter which leads to the sides any water that trickles down the face of the wall.

Lacing Stone.—This is placed as a voussoir in brick arches of wide span, and serves to bond or lace several courses together (see [Brickwork]).

Lacing Course, a course of dressed stone, bricks or tiles, run at intervals in a wall of rubble or flint masonry to impart strength and tie the whole together (fig. 7).

Long and Short Work, a typical Saxon method of arranging quoin stones, flat slabs and long narrow vertical stones being placed alternately. Earls Barton church in Northamptonshire is an example of their use in old work. In modern work long and short work, sometimes termed “block and start,” is little used (fig. 7).

Parapet, a fence wall at the top of a wall at the eaves of the roof. The gutter lies behind, and waterways are formed through the parapet wall for the escape of the rain-water.

Plinth, a projecting base to a wall serving to give an appearance of stability to the work.

Quoin, the angle at the junction of two walls. Quoins are often executed in dressed stone (fig. 7).

Fig. 9.—(1 in. = 1 ft.)

Rag-bolt, the end of an iron bolt when required to be let into stone is roughed or ragged. A dovetailed mortise is prepared in the stone and the ragged end of the bolt placed in this, and the mortise filled in with molten lead or sand and sulphur (fig. 9).