No. 3.
The Contracting Belt (No. 3), among others, is strictly anatomical in its construction. The front is composed of elastic materials, in which are inserted medical plates, thus combining perfect support and elasticity.
TAPER STAND.
Materials.—5 skeins of pink single Berlin wool, 3 shades of green, 2 skeins of each shade; 2 balls of silver twine, and a skein of wire, No. 24, bell gauge; Penelope needle, No. 2. The stand is made of mill-board, and may be had for sixpence.
THE FLOWER. The Centre Divisions.—Commence with the pink wool, *, work 17 chain, take the wire, and, leaving an end of about 3 inches, place it between the wool and the loop on the needle, work 1 chain across the wire; then fold the wire back even with the other piece, and holding them along the foundation chain, miss the 1 plain that crosses the wire, and work 16 plain on the foundation chain, keeping the doubled wire under the stitches; then leave the wire, as it will not be required in the next round, turn; 1 chain to cross, and up the other side work 3 plain, 3 treble, 5 long, 3 treble, 3 plain, turn, and down the other side, 2 plain, 3 treble, 5 long, 3 treble, 3 plain. Repeat from * 6 times more, and in working the next 17 chain, leave the same length of wire as the chain. When the 7 divisions are made, work 1 single on the 1st plain of the 1st division to make it round; then join on the silver twine, and work the wire under the following stitches: 15 plain up the 1st division, 2 plain in one at the point, * *, 15 plain down the other side; miss 3, 1 plain on the 2d plain stitch of the next division; 7 plain more, join to the 7th stitch of the last 15 plain; 7 plain, 2 plain in one. Repeat from * *, 5 times more; then 7 plain, join to the opposite stitch of the 1st division, 8 plain, then work a plain row along the bottom of the division, and fasten off.
The Inner Divisions.—Commence with the pink wool, make 15 chain; turn, miss 1, and down the foundation chain, 1 plain, 2 treble, 1 long, 6 extra long, 1 long, 1 treble, 1 plain. Repeat 6 times more, then 1 single on the 1st plain stitch of the 1st division to make it round, join on the silver twine; take the wire and work it under the following stitches: 12 plain, 2 plain in one, †, 12 plain down the other side; miss 3, work 7 single up the next division, join to the 5th stitch of the last 12 plain; then 5 plain, 2 plain in one. Repeat from †, 5 times more, then 5 plain, join to the opposite stitch of the 1st division, 7 plain; then work a plain row along the divisions. Fasten off; and for
THE LEAVES.—With the green wool, work 16 chain, turn, miss 1, 2 plain, 13 treble; 2 chain, 1 single in the same stitch as the last; 3 chain, turn, and up the other side, work 3 long in one, 8 long, 4 treble, 3 plain, turn, and down the other side, 2 plain, 4 treble, 8 long, 3 long in one, 3 chain, 1 single in the same stitch as the last. Fasten off; and for