Excavating.—Excavation under the entire house to a depth of about 4′.

Cellar Walls.—Cellar walls built of good sized trap rock. All necessary bluestone sills, cellar steps, and copings, fine tooled brownstone steps for stoops, also fine tooled brownstone sills for the doors and windows above cellar.

Walls.—All stone walls above cellar are medium sized trap rock and well selected, pointed with black mortar.

Brick Trimmings.—Buff brick used for trimmings, as shown on the plans, laid in mortar same color as brick.

Chimneys.—Chimneys built of trap rock and buff brick, and topped out as shown on the plans.

Fireplaces.—Fireplaces built where shown, of white fire brick, and the hearths laid in tile.

Stone Steps.—Stone steps from main entrance to ground.

Porch Floor.—Porch floor is cemented with Portland cement.

Cementing.—The entire cellar bottom is cemented 3” thick with concrete and Portland cement.

Plastering.—The entire first and second stories are plastered three‐coat work, hard finished. Cornices in principal part of first story and second story hall. Center pieces in rooms to correspond.