Trimmer Arches.—Turn trimmer arches over all fireplace openings.

PLASTERER.

Laths.—Laths to be best seasoned pine, free from all imperfections, laid ⅜″ apart and breaking joint.

Plaster.—Plaster will be two coat work, the second to be white sand finish, well floated. The first coat to be best Rockland lime and clean sharp sand, well mixed with long cattle or goat hair, to be thoroughly worked and stacked, all to be well troweled and made perfectly true. Patch up and repair all plastering at completion of building.

PLUMBER.

Lead Pipes.—The lead pipes through to be AA lead pipe. The waste pipes to be heavy; all joints between lead pipes to be heavily wiped, and joints between lead and iron pipes to be made with brass ferrules wiped into lead pipe and calked into iron pipe with molten lead and oakum.

Iron Pipes.—Iron pipes to be heavy C. I. soil pipe, free from all imperfections, and of uniform thickness; thoroughly coated inside and out with coal tar. All joints to be calked tight with molten lead and oakum.

Drain Pipe.—From point marked on plans run a four inch C. I. pipe to roof, making all proper branches for water closets, baths, basins, tubs, sinks, and at roof to be capped with Smith’s patent ventilating cap. At foot of this place a 4″ running trap, with hole for cleaning out, and an inlet to run out under servants’ water closet. All branches to be Y branches, 4″ for water closet, and 2″ for basins, sink, etc. Plumber to make connections with street pipe.

Lead Supply Pipe.—Run from point marked on plans a ¾″ lead pipe. Place at the beginning of this a rough round way lever handle, stop and waste cock. Connect with main supply. From the ¾ lead pipe make all proper connections for water closets, tubs, baths, and sink with ⅝″ pipe, all to be graded so as to empty at stock cock. In kitchen, over sink, put two cocks (lever handle), so as to control supply of hot and cold water to second floor, the same to empty in the sink.

Boiler.—Furnish and set where shown in kitchen a heavy 30 gallon galvanized iron boiler with stand complete. The boiler to be supplied with water through a branch of ⅝″ lead pipe, and connect with water tank of range with a ⅝″ extra strong lead pipe, the other part of boiler to be fitted up with ⅝″ strong lead pipe with ⅝″ sediment cock, and the required length of light lead pipe to empty into sink trap (boiler to have a safety attachment). Furnish and put on to supply to boiler in the most convenient place a ⅝″ finished lever handled stop cock to control supply to boiler. From head of boiler run lines of ⅝″ lead pipe to supply sink and tubs in kitchen, basin, and bath tub on second floor.