EAST TENNESSEE, VIRGINIA & GEORGIA SYSTEM.

Number Changed.Cost of Labor.Cost of Material.Total Cost.Average Cost.
Engines and tenders.180$ 8,227.47$ 2,904.30$ 11,131.77$ 61.82
Pass., bag., and mail cars.168734.9359.67794.604.73
Freight cars and cabooses.5,17517,425.571,224.0818,649.653.60
M. of W. cars.4392,038.44549.472,587.915.89
Miles
Track.
Track (inc. sidings).1,532.727,718.1740,912.0968,630.2644.78
Bridges.1,532.71,808.57200.002,008.571.31
Track tools.1,532.7194.482,573.832,768.311.80
Storage tracks, inc. taking up.37.029,825.411,481.5911,307.00305.44
Shop tools. 472.202,728.303,200.50
Total cost.$68,445.24$52.633.33$121,078.57
Total average
cost per mile.
$ 79.06
Axles condemned577
Wheels condemned754
Wheels burst202
New axles used1,102
New wheels used2,783
Axles turned back8,316
Wheels pressed on without turning axle23,952
New brasses used10,723
Cars narrowed (not including lever or push cars)5,343
Engines narrowed180
Average cost of new centers and crank pins, etc$264.46
Average cost of cutting off hub and pressing wheels and new pins130.67
Average cost of pressing old tires on old centers29.08
Average cost of pressing old tires on broad centers31.83
Average cost of labor putting on new tires22.94

COMPARATIVE STATEMENT OF AVERAGE COST OF VARIOUS ITEMS OF WORK.

M. & O. R.R.L. & N. R.R.E.T.,V. &
G. R.R.
Average.
Engines and tenders—per engine$325.70$202.58$61.82$196.70
Pass., bag., and ex. cars—per car9.87[2]5.814.736.80
Freight cars, per car4.40[3]5.813.604.60
M. of W. cars, per car13.322.725.897.31
Track (inc. sidings bridges, etc.), per mile45.3747.8346.0946.26
Track tools, per mile2.701.311.801.94
Temporary side tracks, per mile192.83 305.44249.13
Total per mile of track, inc. sidings$113.68$100.67$ 79.06$ 97.80

NOTE—Since the preparation of this paper the general manager of the Norfolk & Western Railroad has kindly furnished the following items of expense for that line:

No.Cost.Average Cost.
Engines and tenders95$37,730.00$397.16
Cars (all kinds)3,61537,994.6510.51
Track, miles (including sidings)597.5
Labor 25,296.96
Tools and supplies3,531.12
Changing M. of W. equipment813.13
Switches571.67
Spikes8,508.22
Total track $38,721,1064.80
Total $114,445.75
Total average cost per mile $191.53

And the superintendent of the S.F. & W. R.R. has also furnished the expenses for that road:

No.Average Cost.
Engines and tenders75$76.31
Cars (passenger)954.67
Cars (freight)1,1333.88
Track, including sidings601.7644.49

Nothing was said about shop or other tools, storage tracks, or changing of maintenance of way equipment.