CHAPTER XVI

SPECIAL NOTES

[79.]Efficiency of Execution Analyzed (Two Examples).

In performance of the various alterations and corrections that have been touched upon in the chapters devoted to position adjusting there are some points that deserve special note. This refers to positive execution of the correction which the watchmaker sets out to make.

As an example we may analyze the simple feature of polishing a pivot and cleaning and reoiling a jewel to improve the motion in one of the horizontal positions. Ordinarily this would seem to be a very simple proceeding requiring no additional remarks.

It is, however, quite possible to go through all of the operations of removing, cleaning and reoiling the jewel and polishing the pivot and then find that no improvement has been made in the motion.

Invariably the workman of moderate experience will say that he has just cleaned and reoiled the jewel and polished the pivot and that it must be all right.

Investigation, however, will sometimes show that the pivot has again been marred or that a particle of dirt has found its way into the jewel hole during replacement either through dust in the oil or through clinging to the end of the pivot when the balance was laying on the bench.

This experience is one that comes occasionally to the best and most careful adjusters and if it is found that results have not been obtained the first time it will be necessary to go over the operations a second time.