Plate 27k.—Second period.
General Organization of Natural Cover
This consists in connecting up and coordinating the individual work under the direction of the squad commander. The work should be carried out on the lines adopted for the individual work; and the rules prescribed for the construction of artificial cover (profiles, depths, various shelters) should be followed as far as possible. In arranging the cover, the squads should utilize the natural features of the terrain.
Plate 27l.—Arrangement for a mound of earth.
Plate 27m.—Arrangement for a dry ditch.