Ambulance and Hospital Trains

Supplementing the references already made on pp. [95]-[6] to the employment of ambulance and hospital trains in the South African War, it may here be stated that three out of the seven adapted from rolling stock already in use on the Cape or the Natal Government lines had been prepared in advance of the outbreak of hostilities, namely, two at the Cape and one in Natal, and these three were, consequently, available for immediate use.

"In Cape Colony," as stated in "The Times History of the War in South Africa," "the two hospital trains that had been prepared in September were manned by a complete personnel from England, and were kept in constant touch with Lord Methuen's advance. In most cases they were run up almost into the firing line, and during the actions at Belmont, Graspan, Modder River and Magersfontein, they relieved the force of its sick and wounded in an incredibly short time, conveying some to De Aar and Orange River, and others to the general hospitals at Cape Town." The services thus rendered by the hospital trains were greatly facilitated by the fact that during the first three months of the war the fighting was almost entirely on or alongside the railways. It was, therefore, possible to arrange for a speedy evacuation of wounded from the field hospitals.

The same two trains, after working along the line of communication in Cape Colony, reached Bloemfontein early in April, 1900; and here they were of great use in helping to remove the sufferers from the enteric fever which was filling up, not only all the hospitals, but every other available building, as well, and finally attained, by the end of May, a maximum of 4,000 cases. Unable to meet all requirements arising under these exceptional conditions, the two hospital trains were supplemented by a number of locally-prepared or ordinary trains, made available for the transport either of sick or of convalescents.

In regard to Natal, "The Times History" says that of all the medical arrangements made in connection with the war, "those during Sir Redvers Buller's operations in Natal presented the most satisfactory features."

The line of communication with the base was short, and it was amply supplied with hospital trains. In addition to the one that had been formed before the outbreak of hostilities, a second and similar train was prepared in November, 1889. The hospital train, "Princess Christian," constructed in England at a cost of £14,000, mainly raised by Her Royal Highness—with a handsome contribution from the town of Windsor—reached Cape Town early in February, 1900. It was sent on in sections to Durban, where it was put together in the Natal Government Railway workshops. Under the charge of Sir John Furley, who had also supervised its reconstruction, the train was the first to cross the temporary trestle bridge provided to take the place of the one across the Tugela, at Colenso, which had been destroyed by the Boers, and it was, also, the first train to enter Ladysmith (March 18, 1900) after the siege. Between this time and September 5, 1901, it made 108 journeys, mainly on the Natal side and on the Pretoria-Koomati Poort line; it ran a total of 42,000 miles, and it carried (in addition to the medical and nursing staff) 321 officers and 7,208 non-commissioned officers and men, a total of 7,529 sick and wounded, of whom only three died en route. In June, 1901, the train was formally presented by the Central Red Cross Committee to the Secretary of State for War as a complete hospital train unit for the use of the military forces in South Africa; but, on the assumption, apparently, that no further use for its services as a hospital train was likely to arise, it was subsequently dismantled.

As showing the extent of the work done by the other hospital trains during the course of the war, it may be added that No. 2 ran 114,539 miles, in 226 trips, between November 22, 1898, and the end of August, 1902, conveying 471 officers and 10,325 non-commissioned officers and men, a total of 10,796, of whom only seven died en route.