The unit is completely assembled at the factory except for the following parts which are packed in a separate carton and strapped to the skids inside the shipping carton:
- 1 - 3/4" × Close Steel Nipple
- 1 - 3/4" × 3/4" × 1/2" Tee
- 1 - Fig. 105 Tridicator
- 1 - 3/4" No. 10-402-05 ASME Relief Valve
- 1 - 3/4" No. 600-19 Boiler Drain
- 1 - T87F-2055 Thermostat
The jacket extension for 128CPO is shipped in separate carton.
DAMAGE IN TRANSIT
Upon receipt of shipment of this material, inspect all cartons for external damage. If external damage is noted, open the carton and inspect for damage to equipment. Mark the number of cartons received in this condition on the delivering carrier's waybill, and request the services of their inspector.
If, upon opening a carton, concealed damage is discovered, open the entire shipment and note all equipment so damaged. Contact the delivering carrier and request inspection of the damaged equipment. Do not destroy the carton. The inspector from the freight company will need this to determine reason for damage.
Normally claims for any and all damages should be filed with the freight company within five working days after receipt of shipment.
All materials are sold F.O.B. Factory. It is the responsibility of the consignee to file claim with the delivering carrier for material received in a damaged condition.
LOCATING UNIT
BEFORE REMOVING SHIPPING CARTON, LOCATE UNIT IN ITS FINAL POSITION