In case floor is uneven, unit may easily be made level by inserting shims under the 4 shipping lugs. These lugs also keep the jacket 1/2" off the floor, protecting it from wet floors and dampness.

PIPING AND WIRING

Once the unit is in its proper location with the packing carton, skids and packing material removed, it is ready for piping and connection from Room Thermostat and 110 V. 60 Cy. A.C. Current.

CONTROL SYSTEM

The controls furnished are for a one zone Forced Water System consisting of T87F Room Thermostat, L8124A-1007 Triple Acting Aquastat and Circulator Relay, C554A-1018 Cadmium Photocell, R8184G-1005 Burner Relay and V4046A-1009 Oil Valve. Description and complete wiring diagram will be found packed with each control.

SPECIAL CONTROL SYSTEMS

For special control systems such as multiple installations, zone controlled, unit heater, radiant panel, etc., write to factory for wiring diagrams.

CHIMNEY AND BREECHING REQUIREMENTS

The CP boiler should be connected to a vertical vent system that will prevent: (1) positive pressure in the flue, (2) backward flow of flue gas through the unit when the burner stops, and (3) condensation in the flue.

Use double-walled or insulated pipe for sections of the flue in cold areas. All outside vents, except for short extensions, must be insulated to avoid condensation in the flue. Several types of prefabricated chimneys are available providing double-walled or insulated pipe, some with ceramic and others with metallic liners.