[F] ]Amount of excavation paid for.

Drilling and Firing Data for Each Sub-division of SectionDrilling and Firing Data for Total Sections
Sub- divisionsVolume of each sub- division paid forNo. of setsNo. of holes in setNo. times firedTotal lbs. of power per hole firedLinear feet of tunnel brokenTotal length drilledTotal length of similar headingsLength drilled per linear foot of tunnelCu yds per linear foot of tunnelTotal feet drilled per cubic yardTotal lbs. of power per linear foot of tunnelTotal lbs. of power per foot drilledTotal lbs. of power per cubic yard
abcdefghijklmno
A17.775[G]1634.50Σ(c + d) ÷ g(b + i) ÷ gj ÷ k(c + d + f) ÷ gm ÷ jm ÷ k
[H]1911.50
[I]1611.00
[J]1610.756.0195265.005.92510.9717.000.2612.848
A'1.0023-410.255.02128.400.40021.000.700.1661.750
B5.925[G]23-411.004.035217.502.9625.903.500.2001.181
C[K]1321.125
33.334711.1255.0186137.206.6665.586.9750.1871.046
D6.66525-610.753.033222.004.4444.955.5000.2501.237
Total for Heading150.1020.3977.8133.6750.2271.778
E50.009511.505.0405181.0010.0008.1013.5000.1671.350
F88.8810.5421.50
[L]5.0411.504.06821170.5022.2227.6723.2300.1361.046
G22.225.5421.005.0132126.404.4445.944.4000.1660.990
Total for Bench277.9036.6667.5641.1500.1501.133
H9.775310.50
4610.506.0156126.001.62815.963.2500.1251.995
I26.668511.006.0252284.004.44418.9013.3330.1583.000
Total of Trench110.006.07218.1016.5830.1512.731
Total for Whole Section548.0063.1358.9591.4080.1721.446
Powder taken at 0.5 lb. per stick

[G] ]6 Cut Holes-8 feet (Black circle)

[H] ]9 First Side Rd. and Bottom-7 feet (Circle with dot in it)

[I] ]6 Back Round-7 feet (Circle with line in it)

[J] ]6 Top Back Round-7 feet (Circle with x in it)

[K] ]A' 7 Holes-3 feet (Open circle)