TABLE 24.— Shield-Driven Tunnel Work, Manhattan Shaft, River Tunnel North. Table showing the size of the gang, the amount of excavation, and the time per ring taken for the various operations involved in building tunnel through the several kinds of ground encountered; also the extent and nature of all the unavoidable delays.
| Weight of iron | Section between rings | Description | Ave. No. of Men | Av. No. of cu. yd. per ring | Time Mucking per cu. yd. | Av. Time per ring, shoving and Mucking | Time for Jacks | Time for Ring Erection, Hrs. and Min. | Bolting Time, Whole Time on Bolts After Ring is Complete. | Time lost repairing hydraulic piping | Total Time. | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length in feet | Material | Ave air Pressure | Method of Excavation | Shield | Drilling | Grouting | Air trans | Total | Ordinary | Bore 1 | Bore 2 | Taper | Mean | Ordinary | Bore 1 | Bore 2 | Taper | Mean | Ordinary | Bore 1 | Bore 2 | Taper | Mean | |||||||
| A | B | C | D | E | F | G | G | G | G | G | H | H | H | H | H | |||||||||||||||
| Ordinary | 1-54 | 135.0 | Rock | 0 | [P] | 14 | Time for jacks for light iron is included in shoving and mucking | 4-00 | 4-21 | 4-04 | Excavation partially completed previously. | |||||||||||||||||||
| 55-80 | 65.0 | " | 19 | [P] | 24 | 7 | ⅓ | 1 | 32 | 41 | 0-31 | 21-00 | 6-04 | 5-30 | 5-57 | } | Bolting time for light iron is included in erection. | { | 27-4 | 26-30 | 26-57 | |||||||||
| 81-107 | 65.0 | Soft rock | 18 | [P] | 22 | 5 | 2 | 29 | 41 | 0-33 | 22-30 | 4-26 | 4-26 | } | { | 26-56 | 26-56 | |||||||||||||
| 108-153 | 117.5 | Rock | 14 | [P] | 17 | 11 | 2 | 30 | 41 | 0-39 | 26-31 | 3-10 | 3-30 | 3-12 | } | { | 29-41 | 30-1 | 29-43 | |||||||||||
| 154-194 | 102.5 | Rock and earth | 14 | [P] | 23 | 6 | 2 | 31 | 41 | 0-27 | 18-34 | 2-08 | J. | J. | 2-40 | 2-10 | } | { | 20-42 | 21-14 | 20-44 | |||||||||
| 195-215 | 52.5 | Silt | 19 | [P]Breasting | 28 | 2 | 30 | 41 | 0-10 | 6-46 | 3-03 | 3-30 | 3-30 | 3-09 | } | { | 9-49 | 10-16 | 10-16 | 9-55 | ||||||||||
| 216-393 | 445.0 | " | 20 | [Q]8 doors | 27 | 4 | 31 | 46 | 0-05 | 3-53 | 2-40 | 2-56 | 3-00 | 3-10 | 2-50 | } | { | 0-09 | 6-42 | 6-58 | 7-02 | 7-12 | 6-52 | |||||||
| 394-429 | 90.0 | Silt, piles, rip-rap | 24 | [P]Breasting | 28 | 4 | 32 | 46 | 0-18 | 17-09 | 3-43 | 3-39 | 4-46 | 4-11 | 3-56 | } | { | 23-79 | 23-25 | 24-32 | 23-57 | 23-42 | ||||||||
| 430-509 | 200.0 | Silt | 23 | [Q]1 door | 24 | 3 | 27 | 11 | 0-10 | 1-42 | 3-14 | 4-12 | 3-59 | 3-46 | 3-34 | } | { | 0-18 | 5-14 | 6-12 | 5-59 | 5-46 | 5-34 | |||||||
| 510-692 | 457.5 | " | 23 | [Q]3 doors | 26 | 4 | 30 | 30 | 0-05 | 1-47 | 2-08 | 2-21 | 2-32 | 2-50 | 2-18 | } | { | 0-11 | 4-06 | 4-19 | 4-30 | 4-48 | 4-16 | |||||||
| 55-692 | 1,593.0 | 20 | 25 | 2 | 3 | 30 | 30 | 0-15 | 7-35 | [N] | 3-02 | 4-31 | 3-12 | } | { | 0-17 | 10-54 | 12-23 | 11-04 | |||||||||||
| 216-692 | 1,192.5 | 22 | 26 | 4 | 30 | 30 | 0-07 | 3-42 | [N] | 2-38 | 2-59 | 3-08 | 1-30 | 2-50 | } | { | 0-25 | 6-45 | 7-06 | 7-15 | 5-37 | 6-57 | ||||||||
| Heavy | 693-954 | 655.0 | Silt | 24 | [Q]1 door | 28 | 6 | 34 | 11 | 0-12 | 1-02 | [N] | 1-52 | 2-05 | 2-15 | 2-29 | 2-0 | } | { | 0-13 | 3-7 | 3-20 | 3-30 | 3-44 | 3-15 | |||||
| 955-1,014 | 150.0 | " | 24 | [Q]1 " | 28 | 8 | 36 | 12 | 0-04 | 0-48 | 0-16 | 0-51 | 1-18 | 1-08 | 0-50 | 0-58 | 0-24 | 0-21 | 0-37 | 0-10 | 0-25 | 0 | 2-19 | 2-43 | 2-49 | 2-04 | 2-27 | |||
| 1,015-1,074 | 150.0 | " | 24 | [Q]1 " | 25 | 8 | 33 | 12 | 0-03 | 0-41 | 0-13 | 0-43 | 0-46 | 0-55 | 0-40 | 0-45 | 0-31 | 0-30 | 0-52 | 0-23 | 0-34 | 0-02 | 2-10 | 2-12 | 2-43 | 1-59 | 2-15 | |||
| 1,075-1,134 | 150.0 | " | 24 | [Q]1 " | 27 | 9 | 36 | 8 | 0-04 | 0-34 | 0-12 | 1-04 | 1-01 | 1-15 | 1-20 | 1-08 | 0-28 | 0-35 | 1-40 | 0-52 | 0-44 | 0-03 | 2-21 | 2-25 | 3-44 | 3-01 | 2-41 | |||
| 1,135-1,194 | 150.0 | " | 25 | [Q]1 " | 26 | 8 | 34 | 8 | 0-04 | 0-33 | 0-13 | 0-53 | 0-51 | 0-58 | 0-46 | 0-53 | 0-32 | 0-20 | 0-24 | 0-18 | 0-26 | 0 | 2-11 | 1-57 | 2-08 | 1-50 | 2-05 | |||
| 1,195-1,224 | 75.0 | " | 25 | [Q]1 " | 24 | 9 | 33 | 6 | 0-04 | 0-24 | 0-12 | 0-58 | 0-42 | 0-53 | 0-50 | 0-54 | 0-19 | 0-20 | 0-34 | 0-35 | 0-23 | 0 | 1-53 | 1-38 | 2-03 | 2-01 | 1-53 | |||
| 1,225-1,262 | 95.0 | " | 25 | [Q]1 " | 23 | 9 | 32 | 5 | 0-05 | 0-23 | 0-10 | 0-48 | 0-49 | 0-50 | 0-35 | 0-47 | 0-29 | 0-29 | 0-36 | 0-18 | 0-30 | 0 | 1-50 | 1-51 | 1-59 | 1-26 | 1-50 | |||
| 1,263-1,277 | 37.5 | " | 25 | [Q]1 " | 24 | 10 | 34 | 10 | 0-04 | 0-36 | 0-11 | 0-47 | 0-50 | 0-52 | 0-48 | 0-52 | 0-23 | 0-23 | 0-41 | 0-23 | 0-27 | 0 | 1-57 | 2-0 | 2-20 | 1-58 | 2-06 | |||
| 1,278-1,307 | 75.0 | " | 25 | [Q]1 " | 21 | 10 | 31 | 17 | 0-04 | 1-09 | 0-10 | 1-03 | 1-01 | 1-06 | 0-00 | 1-04 | 0-33 | 0-34 | 0-51 | 0-0 | 0-36 | 0 | 2-55 | 2-54 | 3-16 | 0-0 | 2-59 | |||
| 1,308-1,326 | 47.5 | " | 28 | [Q]1 " | 27 | 11 | 38 | 22 | 0-05 | 1-39 | 0-18 | 1-25 | 1-48 | 1-50 | 0-50 | 1-31 | 0-49 | 0-42 | 0-58 | 0-25 | 0-48 | 0 | 4-11 | 4-27 | 4-45 | 3-12 | 4-16 | |||
| 955-1,326 | 930.0 | 24 | 26 | 9 | 35 | 11 | 0-04 | 0-41 | 0-13 | 0-55 | 0-59 | 1-03 | 0-55 | 0-58 | 0-29 | 0-27 | 0-49 | 0-31 | 0-32 | 0 | 2-18 | 2-20 | 2-46 | 2-20 | 2-24 | |||||
| 693-1,326 | 1,585.0 | 24 | 27 | 8 | 35 | 12 | 0-04 | 0-51 | [N] | 1-27 | 1-34 | 1-41 | 1-38 | 1-31 | [O] | 0-06 | 2-24 | 2-31 | 2-38 | 2-35 | 2-28 | |||||||||
| All | 216-1,326 | 2,777.5 | 23 | 27 | 7 | 34 | 19 | 0-06 | 1-59 | [N] | 1-55 | 2-08 | 2-16 | 1-35 | 2-03 | [O] | 0-16 | 4-18 | ||||||||||||
| 55-1,326 | 3,180.0 | 22 | 26 | 6 | 32 | 21 | 0-10 | 4-13 | [N] | 2-22 | [O] | 0-12 | 6-47 | |||||||||||||||||
SUMMARY
| Weight of iron | Section between rings | Description | Ave. No. of Men in Gang | Average No. of cubic yard per ring | Time mucking, per cubic yard | Average Time per Ring | Unavoidable Delays (Not Included in Average Time per Ring). | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length in feet | Material | Ave. air Pressure | Method of Excavation | Shield | Drilling | Grouting | Air Trans | Total | Shoving and mucking[N] | Erection[O] | Lost time | Total | Items | Time hrs--min | ||||
| Ordinary | 1-54 | 135.0 | Rock | 0 | [P] | 14 | 4-14 | First bulkhead | 172-00 | |||||||||
| 55-194 | 350.0 | Earth and rock | 16 | [P] | 22 | 6 | ⅓ | 2 | 30 | 41 | 0-32 | 21-44 | 4-04 | 25-48 | Second bulkhead | 119-00 | ||
| 195-393 | 497.5 | Silt | 20 | [P]Breasting | 27 | 4 | 31 | 38 | 0-07 | 4-11 | 2-52 | 0-09 | 7-12 | Grouting | 200-00 | |||
| 394-440 | 117.5 | " | 24 | [P]Breasting | 28 | 4 | 32 | 41 | 0-18 | 11-54 | 4-17 | 1-41 | 17-52 | Blowout | 73-00 | |||
| 441-692 | 630.0 | " | 23 | [Q]3 doors | 25 | 4 | 29 | 17 | 0-06 | 2-04 | 2-34 | 0-42 | 5-20 | Cradle | 100-00 | |||
| 216-692 | 1,192.5 | 22 | 26 | 4 | 30 | 30 | 0-07 | 3-42 | 2-50 | 0-25 | 6-57 | Total | 664-00 | |||||
| 55-692 | 1,595.0 | 20 | 25 | 2 | 3 | 30 | 30 | 0-15 | 7-35 | 3-12 | 0-17 | 11-04 | Per ring | 0-39 | ||||
| Heavy | 693-1,326 | 1,585.0 | Silt | 24 | [Q]1 door | 27 | 8 | 35 | 12 | 0-04 | 0-51 | 1-31 | 0-06 | 2-28 | ||||
| All | 55-1,326 | 3,180.0 | 22 | 26 | 6 | 32 | 21 | 0-10 | 4-13 | 2-22 | 0-12 | 6-47 | ||||||
[N] Including time for jacks.
[O] Including bolting time.