[P] Excavating ahead of shield.
[Q] Shoving shield into silt with ... doors open.
TABLE 25.— Shield-Driven Tunnel Work, Manhattan Shaft, River Tunnel South. Table showing the size of the gang, the amount of excavation, and the time per ring taken for the various operations involved in building tunnel through the several kinds of ground encountered; also the extent and nature of all the unavoidable delays.
| Weight of iron | Section between rings | Description | Average No. of Men in Gang | Av. No. of cu. yd. per ring | Time Mucking, per cu. yd. | Av. time per ring shoving and Mucking | Time for Jacks | Time for Ring Erection, Hrs. and Min. | Bolting Time, Whole Time on Bolts After Ring is Complete. | Time lost repairing hydraulic piping | Total Time. | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length in feet | Material | Ave air pressure | Method of Excavation | Shield | Drilling | Grouting | Air trans | Total | Ordinary | Bore 1 | Bore 2 | Taper | Mean | Ordinary | Bore 1 | Bore 2 | Taper | Mean | Ordinary | Bore 1 | Bore 2 | Taper | Mean | |||||||
| A | B | C | D | E | F | G | G | G | G | G | H | H | H | H | H | |||||||||||||||
| Ordinary | 1-68 | 170.0 | Rock | 0 | [R] | 20 | 5 | 5 | 2 | 32 | 41 | 0-14 | 9-53 | Time for jacks for light iron is included in shoving and mucking | 5-27 | 4-32 | 5-07 | Excavation partially completed previously. Bolting time for light iron is included in erection. | 15-20 | 14-25 | 15-00 | |||||||||
| 69-95 | 67.5 | Rock and earth | 13 | [R] | 22 | 8 | 2 | 32 | 41 | 0-24 | 16-18 | 3-02 | 2-40 | 3-00 | 19-20 | 18-58 | 19-18 | |||||||||||||
| 96-141 | 115.0 | Rock | 10 | [R] | 21 | 13 | 2 | 36 | 70 | 0-16 | 18-16 | 2-08 | 2-27 | 2-09 | 0-03 | 20-27 | 20-46 | 20-28 | ||||||||||||
| 142-191 | 125.0 | Rock and earth | 15 | [R] | 24 | 7 | 2 | 33 | 52 | 0-20 | 17-27 | 2-08 | J | J | 2-04 | 2-08 | 0-12 | 19-47 | 19-43 | 19-47 | ||||||||||
| 192-203 | 30.0 | Silt | 18 | [R]Breasting | 23 | 3 | 26 | 36 | 0-13 | 7-58 | 2-27 | 6-00 | 2-10 | 3-15 | 2-47 | 1-20 | 11-45 | 15-18 | 11-28 | 12-33 | 12-05 | |||||||||
| 204-388 | 462.5 | " | 18 | [S]7 doors | 27 | 3 | 30 | 37 | 0-05 | 3-19 | 2-41 | 2-49 | 2-54 | 2-56 | 2-47 | 0-05 | 6-05 | 6-13 | 6-18 | 6-20 | 6-11 | |||||||||
| 389-429 | 102.5 | Silt, piles and rip-rap. | 22 | [S] ]6 doors [ [R]Breasting | 24 | 4 | 28 | 40 | 0-17 | 12-42 | 3-15 | 2-36 | 5-03 | 3-26 | 3-27 | 0-38 | 16-35 | 15-56 | 18-23 | 16-46 | 16-47 | |||||||||
| 430-504 | 187.5 | Silt | 21 | [S]3 doors | 23 | 5 | 28 | 20 | 0-06 | 1-51 | 2-53 | 3-17 | 3-00 | 2-57 | 2-59 | 0-39 | 5-23 | 5-47 | 5-30 | 6-27 | 5-29 | |||||||||
| 505-629 | 312.5 | " | 22 | [ [S]4 doors | 25 | 6 | 31 | 27 | 0-05 | 2-20 | 2-23 | 2-40 | 2-45 | 2-28 | 2-30 | 0-23 | 5-06 | 5-23 | 5-28 | 5-11 | 5-13 | |||||||||
| 630-692 | 157.5 | " | 23 | [ [S]2 doors. | 24 | 8 | 32 | 22 | 0-05 | 1-53 | 1-54 | 2-10 | 2-22 | 2-23 | 2-02 | 0-08 | 3-55 | 4-11 | 4-23 | 4-24 | 4-03 | |||||||||
| 204-692 | 1,222.5 | 21 | 25 | 5 | 30 | 30 | 0-07 | 3-27 | [T] | 2-34 | 2-45 | 2-58 | 2-35 | 2-42 | 0-18 | 6-19 | 6-30 | 6-43 | 6-20 | 6-27 | ||||||||||
| 69-692 | 1,560.0 | 17 | 23 | 4 | 0 | 3 | 30 | 36 | 0-11 | 6-40 | [T] | 2-47 | 3-18 | 2-52 | 0-15 | 9-42 | 10-13 | 9-47 | ||||||||||||
| Heavy | 693-766 | 185.0 | Silt | 24 | [S]2 doors | 21 | 6 | 27 | 22 | 0-05 | 1-35 | 0-25 | 1-18 | 1-44 | 1-30 | 1-40 | 1-25 | 0-43 | 1-09 | 0-52 | 0-50 | 0-49 | 0-07 | 4-08 | 5-00 | 4-29 | 4-37 | 4-21 | ||
| 767-806 | 100.0 | " | 24 | [ [S]2 " | 22 | 7 | 29 | 22 | 0-05 | 1-19 | 0-21 | 1-00 | 0-56 | 1-37 | 1-21 | 1-08 | 0-38 | 0-24 | 0-43 | 0-38 | 0-42 | 0-02 | 3-20 | 3-02 | 4-02 | 3-41 | 3-32 | |||
| 807-900 | 235.0 | " | 24 | [ [S]1½ " | 23 | 8 | 31 | 19 | 0-05 | 1-11 | 0-17 | 0-58 | 1-13 | 1-08 | 1-12 | 1-04 | 0-39 | 0-34 | 0-56 | 0-31 | 0-40 | 0-06 | 3-11 | 3-21 | 3-38 | 3-17 | 3-18 | |||
| 901-933 | 82.5 | " | 25 | [S]1 door | 30 | 10 | 40 | 19 | 0-04 | 1-13 | 0-09 | 0-59 | 1-05 | 0-59 | 1-00 | 0-34 | 0-26 | 1-47 | 0-43 | 0-05 | 3-00 | 2-58 | 4-13 | 3-10 | ||||||
| 934-988 | 137.5 | " | 25 | [ [S]1 " | 30 | 11 | 41 | 16 | 0-04 | 0-54 | 0-12 | 0-49 | 0-44 | 0-56 | 0-50 | 0-28 | 0-34 | 0-34 | 0-30 | 0-06 | 2-29 | 2-30 | 2-42 | 2-32 | ||||||
| 989-1,043 | 137.5 | " | 25 | [ [S]1 " | 28 | 11 | 39 | 13 | 0-05 | 0-52 | 0-14 | 0-51 | 0-44 | 0-52 | 1-14 | 0-52 | 0-33 | 0-24 | 0-51 | 0-35 | 0-35 | 0-04 | 2-34 | 2-18 | 2-53 | 2-59 | 2-37 | |||
| 1,044-1,053 | 25.0 | " | 26 | [ [S]1 " | 25 | 9 | 34 | 16 | 0-07 | 0-40 | 0-15 | 1-04 | 1-15 | 0-50 | 0-55 | 1-02 | 0-23 | 0-38 | 0-30 | 0-55 | 0-36 | 3-22 | 3-48 | 3-15 | 3-45 | 3-33 | ||||
| 1,054-1,068 | 37.5 | 26 | [ [S]1 " | 26 | 9 | 35 | 8 | 0-05 | 0-36 | 0-08 | 0-57 | 0-40 | 1-02 | 0-56 | 0-33 | 0-25 | 0-35 | 0-32 | 2-14 | 1-49 | 2-21 | 2-12 | ||||||||
| 1,069-1,110 | 105.0 | " | 26 | [S]1 " | 30 | 11 | 41 | 14 | 0-06 | 1-00 | 0-15 | 0-48 | 0-54 | 1-06 | 1-31 | 0-56 | 0-32 | 0-40 | 0-48 | 0-46 | 0-37 | 0-05 | 2-40 | 2-54 | 3-14 | 3-37 | 2-53 | |||
| 693-1,110 | 1,045.0 | 25 | 25 | 8 | 33 | 18 | 0-05 | 1-29 | [T] | 1-01 | 1-08 | 1-09 | 1-19 | 1-05 | 0-37 | 0-39 | 0-52 | 0-40 | 0-40 | 0-05 | 3-12 | 3-21 | 3-35 | 3-33 | 3-19 | |||||
| All | 204-1,110 | 2,267.5 | 23 | 25 | 6 | 31 | 25 | 0-06 | 2-35 | [T] | 2-09 | 2-19 | 2-33 | 2-19 | 2-17 | [U] | 0-12 | 4-56 | 5-06 | 5-20 | 5-06 | 5-04 | ||||||||
| 69-1,110 | 2,605.0 | 20 | 24 | 2 | 5 | 31 | 29 | 0-09 | 4-36 | [T] | 2-19 | 2-46 | 2-25 | [U] | 0-14 | 7--0 | 7-36 | 7-15 | ||||||||||||
SUMMARY
| Weight of iron | Section between rings | Description | Ave. No. of Men in Gang | Average No. of cubic yards per ring | Mucking, per cubic yard | Average Time per ring | Unavoidable Delays (not Included in Average Time per Ring). | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Length in feet | Material | Ave. air pressure | Mehod of Excavation | Shield | Drilling | Grouting | Air Trans | Total | Shoving and mucking[T] | Erection [U] | Lost time | Total | Items | Time hrs min | ||||
| Ordinary | 1-68 | 170.0 | Rock | 0 | [R] | 20 | 5 | 5 | 5 | 32 | 41 | 0-14 | 9-53 | 5-07 | 15-00 | First bulkhead | 160--00 | |
| 69-191 | 307.5 | Rock and earth | 13 | [R] | 22 | 9 | 2 | 33 | 54 | 0-19 | 17-20 | 2-26 | 0-05 | 19-51 | Second bulkhead | 157--45 | ||
| 192-388 | 492.5 | Silt | 18 | [R]Breasting [S]7 doors | 25 | 3 | 28 | 37 | 0-09 | 5-39 | 2-47 | 0-63 | 9-29 | Grouting | 200--00 | |||
| 389-429 | 102.5 | Silt piles and rip-rap | 22 | [R] Breasting [S]6 doors | 24 | 4 | 28 | 40 | 0-17 | 12-42 | 3-27 | 0-38 | 16-47 | Blowout | 69--45 | |||
| 430-692 | 657.5 | Silt | 22 | [S]3 doors | 24 | 6 | 30 | 24 | 0-05 | 1-58 | 2-29 | 0-22 | 4-49 | Waiting for heavy iron | 64--0 | |||
| 204-692 | 1,222.5 | 21 | 25 | 5 | 30 | 30 | 0-07 | 3-27 | 2-42 | 0-18 | 6-27 | Total | 715--30 | |||||
| 69-692 | 1,560.0 | 17 | 23 | 4 | 0 | 3 | 30 | 36 | 0-11 | 6-40 | 2-52 | 0-15 | 9-47 | Per ring | 0--39 | |||
| Heavy | 693-1,110 | 1,045.0 | 25 | [S]1 door | 25 | 8 | 33 | 18 | 0-05 | 1-29 | 1-45 | 0-06 | 3-19 | |||||
| All | 69-1,110 | 2,605.0 | 20 | 24 | 5 | 31 | 29 | 0-09 | 4-36 | 2-25 | 0-14 | 7-15 | ||||||
[R] Excavating ahead of shield.
[S] Shoving shield into silt with ... doors open.
[T] Including time for jacks.