[U] Including bolting time.

TABLE 26.— Shield-Driven Tunnel Work, Weehawken Shaft, River Tunnel North. Table showing the size of the gang, the amount of excavation, and the time per ring taken for the various operations involved in building tunnel through the several kinds of ground encountered; also the extent and nature of all the unavoidable delays.

Weight of ironSection between ringsDescriptionAve. No. of Men in GangAv. No. of cu. yd. per ringTime Mucking, per cu. yd.Av. Time per ring, shoving and muckingTime for JacksTime for Ring Erection, Hrs. and Min.Bolting Time, Whole Time on Bolts After Ring is Complete.Time lost repairing hydraulic pipingTotal Time.
Length in feetMaterialAve air PressureMethod of ExcavationShieldDrillingGroutingAir transTotalStraightBore 1Bore 2TaperMeanStraightBore 1Bore 2TaperMeanStraightBore 1Bore 2TaperMean
ABCDEFGGGGGHHHHH
Ordinary1-2460.0Rock0[X]9.040010460-064-32Time for jacks for light iron is included in shoving and mucking.6-236-23Excavation partially completed previously.10-5510-55
25-5577.5"20[X]1450.5121460-5139-334-255-104-2943-5844-4344-02
56-7242.5Mixed sand and rock10[X]Breasting222.09226440-2115-052-533-152-550-0418-0218-2418-04
73-165232.5Sand and gravel10[X] "2200.1224390-116-562-272-212-26Bolting time for light iron is included in erection.0-099-329-269-31
166-18447.5Sand and silt with piles20[X] Breasting and cutting piles220.38325420-096-192-31JJ6-302-370-078-5712-569-03
185-253172.5Silt and piles24230.71326430-096-131-572-442-522-002-150-158-259-129-208-288-43
254-293100.0Silt26[Y]8 doors220032560-181-451-581-572-152-452-020-143-573-564-144-444-01
294-30120.0"27190022101-080-581-451-501-172-062-532-582-25
302-30715.0"27[Y]8 doors2100223260-094-032-201-401-552-572-226-235-435-587-006-25
308-34287.5"281900221000-362-001-342-421-582-022-362-103-182-292-38
343-34712.5"28[Y]8 doors150021720-361-112-152-202-432-330-394-054-104-434-23
348-459280.0"282000323000-332-032-042-092-232-060-142-502-512-563-102-53
460-49487.5"28[Y]8 doors210032490-091-232-492-302-501-502-380-274-394-204-403-404-28
495-51347.5"288 "2300427170-051-282-352-231-552-102-264-033-513-233-383-54
514-605230.0"288 "2500429260-041-442-122-342-292-152-193-564-184-133-594-03
606-62447.5"288 "2400428160-041-071-542-332-161-352-043-013-403-232-423-11
625-64040.0"288 "3800543240-031-132-142-552-352-462-283-274-083-483-593-41
25-6401,540.020
185-6401,140.0262300.2326160-071-58[V]2-072-192-262-152-130-094-144-264-334-224-20
Heavy641-64717.5Silt28[Y]8 doors2400630190-040-08[V]1-202-081-651-401-410-400-351-250-550-473-083-514-283-433-36
648-751260.0"28[Y]8 "2200426140-030-360-121-211-221-261-551-230-310-290-380-300-320-122-522-513-043-252-55
752-795110.0"28[Y]8 "1800725100-030-290-140-461-251-312-371-100-480-310-440-350-430-052-222-443-034-002-41
796-82575.0"28[Y]8 "1900102850-080-400-110-481-311-340-531-030-311-030-493-270-512-103-253-145-112-45
826-85472.5"28[Y]8 "1700320150-030-480-190-541-121-021-231-010-220-370-380-200-270-062-293-022-532-562-41
855-88167.5"28[Y]8 "230093270-050-330-160-590-451-151-201-010-220-210-450-400-260-452-552-403-343-343-01
882-982252.5"28[Y]8 "2000828100-020-200-140-491-021-010-500-540-410-360-360-150-390-122-162-242-231-512-19
983-99020.0"28[Y]8 "2100728170-020-340-140-400-400-480-441-150-150-280-482-431-432-042-20
991-1,049147.5"28[Y]8 "230073080-030-210-110-400-480-390-410-410-340-550-411-531-542-061-54
1,050-1,07462.5"28[Y]8 "240093370-030-180-100-430-440-460-400-430-351-150-070-350-480-041-502-312-251-472-03
1,075-1,11090.0"28[Y]8 "25001035160-020-330-120-501-021-060-580-550-350-460-582-100-410-212-312-542-104-142-42
641-1,1101,175.028210072880-040-300-140-561-081-121-291-020-360-360-440-546-380-112-272-272-513-182-35
All185-1,1102,315.0282200.1527120-071-200[V]1-482-012-112-171-56[W]0-103-183-313-413-473-26
25-1,1102,715.026210.10.132417.10-123-13[V]2-05[W]0-095-27

SUMMARY

Weight of ironSection between ringsDescriptionAverage No. of Men in GangAverage No. of cubic yards per ringTime mucking, per cubic yardAverage Time per Ring.Unavoidable Delays (not Included in Average Time per Ring).
Length in feetMaterialAve. air PressureMethod of ExcavationShieldDrillingGroutingAir transTotalShoving and mucking [V]Erection [W]Lost timeTotalItemsTime hrs min
Ordinary1-2460.0Rock0[X]9.040010460-064-326-230-0010-55First bulkhead132-00
25-5577.5"20[X]1450.5121460-5139-334-290-0044-02Second bulkhead158-50
56-7242.5Mixed sand and rock10[X]Breasting222.09226440-2115-052-550-0418-04Grouting240-00
73-165232.5Sand & gravel10[X]Breasting220.1224390-116-562-260-09 9-31Old cave-in234-00
166-18447.5Sand and silt with piles20[X]Breasting and cutting piles220.38325420-096-192-370-07 9-03Shoving tube128-00
185-253172.5Silt w/ piles24[X]Breasting and cutting piles230.71326430-096-132-150-05 8-43--
254-640110.0Silt26[Y]Doors2200325110-071-132-200-08 3-41Total892-50
25-6401,540.020[Y]Doors210.3.12324240-145-062-240-08 7-38per ring0-49
Hvy641-1,1101,175.028210072880-040-441-400-112-35
All25-1,1102,715.026210.10.132417.10-123-133-050-095-27

[V] Including time for jacks.

[W] Including bolting time.

[X] Excavating ahead of shield.

[Y] Shoving shield into silt with ... doors open.