TABLE 27.— Shield-Driven Tunnel Work, Weehawken Shaft, River Tunnel South. Table showing the size of the gang, the amount of excavation, and the time per ring taken for the various operations involved in building tunnel through the several kinds of ground encountered; also the extent and nature of all the unavoidable delays.

Weight of iron.Section between rings.Description.Ave. No. of Men in Gang.Av. No. of cu. yd. per ring.Time Mucking, per cu. yd.Av. Time per ring Shoving and Mucking.Time for Jacks.Time for Ring Erection, Hrs. and Min.Bolting Time, (Whole Time on Bolts After Ring is Complete.)Time lost repairing hydraulic piping.Total Time.
Length in feet.Material.Ave. air Pressure.Method of Excavation.Shield.Drilling.Grouting.Air trans.Total.Straight.Bore 1.Bore 2.Taper.Mean.Straight.Bore 1.Bore 2.Taper.Mean.Straight.Bore 1.Bore 2.Taper.Mean.
ABCDEFGGGGGHHHHH
Ordinary.1-2767.5Rock9[B]Excavation partially completed previously.8-303-458-08Bolting time for light iron is included in erection.0-1421-1116-2620-49
28-4237.5"12[B]134111948.70-2520-334-234-004-210-1225-0824-4525-06
43-5840.0Rock or gravel12[B]192222544.20-4633-444-165-454-441-1539-1540-4439-43
59-153237.5Gravel and sand16[B]Breasting25143039.00-128-062-194-182-230-3010-5512-5410-59
154-17042.5Sand and silt with piles18"26153241.60-107-102-00J.J.1-481-590-009-10J.J.8-589-09
171-236165.0Silt with piles22Top half22132642.60-107-232-362-552-581-242-350-0510-0410-2310-268-5210-03
237-25957.5Silt25[C]1 door18132213.80-112-293-012-051-282-002-320-205-504-544-174-495-21
260-302107.5"27[C]1 door1521700-322-342-353-384-283-050-083-143-154-185-083-45
303-350120.0"27[C]8 doors154196.90-070-522-592-282-371-442-410-073-583-273-362-433-40
351-37870.0"27.5[C]8 "1862400-332-052-322-482-002-180-172-553-223-382-503-08
379-424115.0"27.5[C]8 "194236.90-070-483-342-513-183-193-220-254-474-094-314-324-35
425-522245.0"28[C]1 door194236.70-060-453-093-513-003-283-160-164-104-524-014-294-17
523-625257.5"28[C]1 "2042400-321-361-371-471-511-390-122-202-212-312-352-23
171-6251,137.527194239.70-111-44[Z]2-372-412-412-322-380-134-344-384-384-294-35
28-6251,495.02519.80.83.42417.80-144-14[Z]2-410-167-11
Heavy.626-64957.5Silt28[C]1 door1631912.20-122-23[Z]2-192-302-051-422-161-011-041-040-501-010-326-156-296-045-276-12
650-733210.0"28[C]8 doors1942313.50-570-131-421-241-471-481-391-150-520-550-421-070-324-393-584-244-124-28
734-75350.0"28[C]8 "245298.30-050-410-171-061-550-381-201-120-380-441-130-200-440-062-483-432-552-443-00
754-844227.5"28[C]8 "2683412.80-040-510-161-191-411-520-501-290-390-500-540-400-440-253-304-084-183-023-45
845-85937.5"28[C]8 "279365.60-070-390-191-241-081-101-200-450-150-150-370-483-553-093-113-43
860-899100.0"28[C]8 "2483316.50-020-390-131-001-051-131-040-590-320-490-520-072-582-363-012-55
900-93590.0"28[C]1 door2573211.50-030-290-140-471-130-521-100-520-390-430-320-200-380-042-182-432-112-172-17
936-96370.5"28[C]1 "258335.90-030-190-150-590-470-550-560-340-160-410-320-372-442-142-472-39
964-1,003100.0"28[C]1 "2510358.10-030-270-100-510-521-050-530-320-450-370-350-162-162-302-352-21
1,004-1,060142.5"28[C]1 "2610368.70-030-300-151-011-091-050-451-030-540-370-490-400-490-243-042-553-032-343-01
1,061-1,110125.0"28[C]1 "3710476.20-030-190-100-420-490-540-450-450-240-260-390-250-270-001-351-442-021-391-41
1,111-1,238320.0"28[C]1 "3093915.60-020-380-160-481-061-041-230-560-360-340-571-120-410-022-202-362-573-312-33
1,239-1,312185.0"283993813.00-030-360-181-041-011-021-151-070-390-431-120-590-500-102-472-483-183-183-01
626-1,3121,717.5"283583310.60-040-420-141-061-151-161-181-100-450-400-520-540-470-163-033-073-203-243-09
All171-1,3122,855.0282362910.20-071-15[ [Z]2-092-132-212-202-13[A]0-153-393-433-513-503-43
28-1,3123,212.5262152614.10-102-28[Z]2-18[A]0-155-01

SUMMARY

Weight of iron.Section between rings.Description.Ave. No. of Men in Gang.Average No. of cubic yards per ring.Time mucking, per cubic yard.Average Time per Ring.Unavoidable Delays (not Included in Average Time per Ring).
Length in feet.Material.Ave. air Pressure.Method of Excavation.Shield.Drilling.Grouting.Air Trans.Total.Shoving and mucking. [Z]Erection.[A]Lost time.Total.Items.Time, hrs. min.
Ordinary.28-4237.5Rock12[B]Breast134111948.70-2520-334-210-1225-06First bulkhead80-00
43-5840.0Rock and gravel12"192222544.20-4633-444-441-1539-43Second bulkhead156-00
59-153237.5Gravel and sand16"25143039.00-128-062-230-3010-59Grouting rock sections280-00
154-17042.5Sand or silt, with piles18"26153241.60-107-101-590-09-09Blow-outs222-00
171-236165.0Silt with piles22"22132642.60-107-232-350-0510-03Shield repairs326-40
237-25957.5Silt25[C]1 door18132213.80-112-292-320-205-21Horz. timbers69-30
260-625915.0"271 "184223.60-060-402-390-143-33Total1,134-10
28-6251,495.02519.80.83.42417.80-144-142-410-167-11Per ring0-53
Heavy.626-1,3121,717.5Silt282583310.60-40-561-570-163-09
All.28-1,3123,212.5262152614.10-102-282-180-155-01

[Z] Including time for jacks.

[A] Including bolting time.

[B] Excavating ahead of shield.

[C] Shoving shield into silt with ... doors open.