Section A-B.
Fig. 88.—Sequence of Excavation in the American Method.
Fig. 89.—Strutting the Heading in the American Method.
Section C-D.
Fig. 90.—Temporary Timbering of the Roof in the American Method.
Section E-F.
Fig. 91.—Showing Crown Bars Supported by Segmental Arches.