That's about the whole game—abbreviated—up to tap-time. It takes, on an average, eighteen hours, and your shift may be anything from ten to twenty-four. Of course, there are details, like shoveling in fluor-spar to thin out the slag. Be sure you clear the breast of the furnace, with your shovelful, when you put that into her. Spar eats the dolomite as mice eat cheese.

At intervals the first-helper tilts the whole furnace forward, and she runs out at the doors, which is to drain off the slag that floats on top of the brew. But after much weariness it's tap-time and the "big boss" comes to supervise.

Move aside the shutters covering the round peepholes on her doors, at this time, and you'll see the brew bubbling away like malt breakfast-food ready to eat. But there's a lot of testing before serving. When it is ready, you run to the place where you hid your little flat manganese shovel and take it to the gallery back of the furnace, near the tap-spout. There you can look down on the pit strewn with those giant bucket-ladles and sprinkled with the clean-up men, who gather painfully all that's spilled or slobbered of hot metal, and save it for a second melting. The whole is swept by the omnipresent crane.

At a proper and chosen instant, the senior melter shouts, "Heow!" and the great furnace rolls on its side on a pair of mammoth rockers, and points a clay spout into the ladle held for it by the crane. Before the hot soup comes rushing, the second-helper has to "ravel her out." That function of his almost destroyed my ambition to learn the steel business. Raveling is poking a pointed rod up the tap-spout, till the stopping is prodded away. You never know when the desired but terrific result is accomplished. When it is, he retires as you would from an exploding oil-well. The brew is loose. It comes out, red and hurling flame. Into the ladle it falls with a hiss and a terrifying "splunch." The first and second helpers immediately make matters worse. They stagger up with bags (containing fine anthracite) and drop them into the mess. They have a most damning effect. The flames hit the roof of the pit, and sway and curl angrily along the frail platform on which you stand. Some occult reasoning tells them how many of these bags to drop in, whether to make a conflagration or a moderate house-burning.

The melter waits a few minutes and then shouts your cue. You and another helper run swiftly along the gallery to the side of the spout. At your feet is a pile of manganese, one of the heaviest substances in the world, and seeming heavier than that. It's your job and your helper's to put the pile into the cauldron. And you do it with all manner of speed. The tap stream—at steel heat—is three feet from your face, and gas and sparks come up as the stream hits the ladle. You're expected to get it in fast. You do.

There are almost always two ladles to fill, but you have a "spell" between. When she's tapped, you pick up a piece of sheet iron and cover the spout with it. That's another job to warm frost-bitten fingers. Use gloves and wet burlap—it preserves the hands for future use.

One more step, and the brew is an ingot. There are several tracks entering the pit, and at proper seasons a train of cars swings in, bringing the upright ingot moulds. They stand about seven feet high from their flats. When the ladle is full and slobbering a bit, the craneman swings her gingerly over the first mould. Level with the ladle's base, and above the train of moulds, runs the pouring platform, on which the ingot-men stand.

By means of rods a stopper is released from a small hole in the bottom of the ladle. In a few seconds the stream fills a mould, and the attendant shuts off the steel like a boy at a spigot. The ladle swings gently down the line, and the proper measure of metallic flame squirts into each mould. A trainload of steel is poured in a few minutes.

But this is when all omens are propitious. It's when the stopper-man has made no mistakes. But when rods jam and the stopper won't stop, watch your step, and cover your face. That fierce little stream keeps coming, and nothing that the desperate men on the pouring platform can do seems likely to stem it. Soon one mould is full. But the ladle continues to pour, with twenty tons of steel to go. It can't be allowed to make a steel floor for the pit. It must get into those moulds.