CROSS-SECTION
LONGITUDINAL SECTION
PLAN
| Per Round | Per Cubic Yard | Per linear Foot of Tunnel | |||||||
| Total Depth Drilled | No. of Cubic Yards | Pounds of Dynamite | Adv. | Linear Feet Drilled | Pounds of Dynamite | Cu. Yd. | Linear Feet Drilled | Pounds of Dynamite | |
| Heading | 140-155 | 18-21.6 | 93-131 | 5-6 | 8-9 | 5-6 | 3.6 | 29.-32 | 18-22 |
| Bench | 110-120 | 53-60 | 76-97 | 3½-4 | 2 | 1.4-1.6 | 15.4 | 30.-31 | 21.5-24.6 |
| Total | 19 | 59.63 | 39.5-46.6 | ||||||
| Per cubic yard, whole tunnel section | 3 to 33 | 2.1-2.5 | |||||||
| Blasting Notes: | Number of Sticks | |
| Heading: | First Round: 6 sticks, 60% in each cut hole, cut generallyblasted twice | 36 to 72 |
Second Round: 3 side holes each side, 5 sticks, 40%ea. | 30 | |
Third Round: Rest of side holes and dry holes, 5 sticks, 40%each | 40 | |
| Stub holes, say | 5 to 15 | |
| Total Sticks | 111 to 157 | |
| Total Pounds | 93 to 131 | |
Sub‑bench: | 4 widening holes; 2 to 3 sticks, each, 40% | 10 to 12 |
6 down holes; 5 to 7 sticks, each, 40% | 30 to 42 | |
| Bench: | 6 holes; 6 to 8 sticks each, 40% | 36 to 48 |
| Taking up bottom, average, say | 15 | |
| Total Sticks | 91 to 117 | |
| TotalPounds | 76 to 97 | |
CROSS-SECTION