CROSS-SECTION

LONGITUDINAL SECTION

PLAN

Drilling Method No. 1: Small heading, 60 to 80 ft. long. Twocolumns used in heading, with two drills on each. Drills on sub-benchand main bench mounted on tripods.
Per RoundPer Cubic YardPer linear Foot of Tunnel
Total Depth DrilledNo. of Cubic YardsPounds of DynamiteAdv.Linear Feet DrilledPounds of DynamiteCu. Yd.Linear Feet DrilledPounds of Dynamite
Heading140-15518-21.693-1315-68-95-63.629.-3218-22
Bench110-12053-6076-973½-421.4-1.615.430.-3121.5-24.6
Total1959.6339.5-46.6
Per cubic yard, whole tunnel section3 to 332.1-2.5
Blasting Notes: Number of Sticks
Heading:

First Round: 6 sticks, 60% in each cut hole, cut generallyblasted twice

36 to 72

Second Round: 3 side holes each side, 5 sticks, 40%ea.

30

Third Round: Rest of side holes and dry holes, 5 sticks, 40%each

40
Stub holes, say5 to 15
Total Sticks111 to 157
Total Pounds93 to 131

Sub‑bench:

4 widening holes; 2 to 3 sticks, each, 40%

10 to 12

6 down holes; 5 to 7 sticks, each, 40%

30 to 42
Bench:6 holes; 6 to 8 sticks each, 40%36 to 48
Taking up bottom, average, say15
Total Sticks91 to 117
TotalPounds76 to 97

[Fig. 2.]